Summary for Test 2026-09-05-15-2

Test performed: CTM 202-November 2011

Project Information

Project IdentifiersProject ID: 1000121
DEA: 041Q8204
EFIS: 0418000341
DIST-CO-RTE-PM04-SF-101-25.6/26.1
Award Date10/20/2025
Closeout DateNot set
Work DescriptionSF 101-Roadway Rehab 3R
Location DescriptionRoute 101 in San Francisco County
QA Service Level1 (Verified on 07/08/2024)

Sample Information

Sample Taken Date09/05/2026 Sample Unique Key15
Date that the sample was received by the laboratory/organization performing the testing09/07/2026 Sample typeAcceptance
A brief description of the samplePCC Agg The quantity of what the sample constitutes1950 cy
From where was the sample collectedManufacturer First name of sampler or witnessed byJose Leon
Last name of sampler or witnessed byAmparann Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCemex
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)Orca Quarry
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedStocpile
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1-1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2026-09-05-15
DIME Test ID: 2026-09-05-15-2
Testing Lab: CT D04 - Richmond Field Laboratory
Test Method: CTM 202-November 2011: Method of Test for Sieve Analysis of Fine and Coarse Aggregates
Test Release Date: 2026-09-09

Test Results


What size aggregate is being tested?: Fine Aggregate
Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
For Combined Gradation only, has the fine aggregate sample been reduced?: No
For Combined Gradation only, use #40 Sieve?: No
Input Type: Calculated
Tester's full name: Jose Leon Amparan
Date of test: 09/08/2026
Sieve SizeCumulative Percent Passing
100 %
98 %
82 %
64 %
44 %
21 %
6 %
2 %
General comments (publicly viewable) (Max 1000 characters): SET 4 1950

Test was verified on 9/9/2026 ✔