Summary for Test 2026-09-04-3-1
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 1000775 DEA: 022J9704 EFIS: 0221000154 |
|---|---|
| DIST-CO-RTE-PM | 02-SHA-5,89-Var |
| Award Date | 02/26/2025 |
| Closeout Date | Not set |
| Work Description | BRIDGE POLYESTER CONCRETE OVERLAY AND METHACRYLATE DECK SEAL. |
| Location Description | SHASTA COUNTY ON ROUTE 5 AT VARIOUS LOCATIONS FROM ANTLER UNDERCROSSING TO SODA CREEK ROAD UNDERCROSSING AND ON ROUTE 89 AT VARIOUS LOCATIONS FROM HAT CREEK BRIDGE NO. 06-0085 TO CAYTON CREEK BRIDGE |
| QA Service Level | 1 (Verified on 12/04/2024) |
Sample Information
| Sample Taken Date | 09/04/2026 | Sample Unique Key | 3 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 09/04/2026 | Sample type | Acceptance |
| A brief description of the sample | Skid Testing Request | The quantity of what the sample constitutes | Multiple Lanes |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Mike |
| Last name of sampler or witnessed by | Sears | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | McCuen Construction | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | 06-0028 | Structure name | Slate Creek Bridge |
| Bid Item | 3934657 |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | Polyester Concrete |
|---|---|---|---|
| Type of Traffic Control Provided | Stationary Lane Closure | DIST-CO-RTE | |
| Direction of Travel | Post Mile | 48.83 | |
| Lanes to be Tested | Station |
Test Details
DIME Sample ID: 2026-09-04-3
DIME Test ID: 2026-09-04-3-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-09-09
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 09/08/2026
Air Temperature: 82
Tire Pressure: 25
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: END OF BRIDGE
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 11
Reference Distance 2: 8
Reference Distance 3: 5
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 11
Position for Stationing 2: 11
Position for Stationing 3: 11
Percent Grade for 1st Stationing: -1.0
Percent Grade for 2nd Stationing: -1.0
Percent Grade for 3rd Stationing: -1.0
Corrected Coefficients of Friction for Stationing 1: 0.37
Corrected Coefficients of Friction for Stationing 2: 0.35
Corrected Coefficients of Friction for Stationing 3: 0.33
Average Coefficient of Friction: 0.35
General comments (publicly viewable) (Max 1000 characters): VISUALLY INSPECTED ENTIRE BRIDGE, ALL LOOKED UNIFORMED
LANE #1 ALSO COMPLIES WITH AN .40 AVG
Test was verified on 9/9/2026 ✔