Summary for Test 2026-08-28-9-2

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1001123
DEA: 051H4704
EFIS: 0516000078
DIST-CO-RTE-PM05-SCR-9-9-13.6,15.5
Award Date09/05/2025
Closeout DateNot set
Work DescriptionREPLACE BRIDGES AND INSTALL MGS.
Location DescriptionSANTA CRUZ COUNTY NEAR BOULDER CREEK AT SAN LORENZO RIVER BRIDGE AND AT KINGS CREEK BRIDGE
QA Service Level1 (Verified on 04/10/2025)

Sample Information

Sample Taken Date08/28/2026 Sample Unique Key9
Date that the sample was received by the laboratory/organization performing the testing09/02/2026 Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesBRIDGE DECK
From where was the sample collectedJob Site First name of sampler or witnessed byJarred
Last name of sampler or witnessed byBurrows Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameGordon Ball Construction
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier36-0054 Structure nameKings Creek Bridge
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE5-SCr-009
Direction of Travel Post Mile15.50
Lanes to be Tested Station

Test Details

DIME Sample ID: 2026-08-28-9
DIME Test ID: 2026-08-28-9-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-09-09

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 09/08/2026
Air Temperature: 64
Tire Pressure: 25
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: END OF BRIDGE
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 40
Reference Distance 2: 37
Reference Distance 3: 34
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 10
Position for Stationing 2: 10
Position for Stationing 3: 10
Percent Grade for 1st Stationing: -2.0
Percent Grade for 2nd Stationing: -2.0
Percent Grade for 3rd Stationing: -2.0
Corrected Coefficients of Friction for Stationing 1: 0.41
Corrected Coefficients of Friction for Stationing 2: 0.40
Corrected Coefficients of Friction for Stationing 3: 0.40
Average Coefficient of Friction: 0.40
General comments (publicly viewable) (Max 1000 characters): VISUALLY INSPECTED ENTIRE BRIDGE, ALL LOOKED UNIFORMED DEPARTURE SLAB AND APPROACH SLAB ALOS COMPLY WITH AN .37AVG

Test was verified on 9/9/2026 ✔