Summary for Test 2026-08-18-84-2

Test performed: ASTM D217-21

Project Information

Project IdentifiersProject ID: 1000888
DEA: 07346304
EFIS: 0718000073
DIST-CO-RTE-PM07-LA-101-7.9/11.8
Award Date04/28/2025
Closeout DateNot set
Work DescriptionINSTALL RUBBERIZED HOT MIXED ASPHALT.
Location DescriptionLOS ANGELES COUNTY IN THE CITY AND COUNTY OF LOS ANGELES FROM 0.1 MILE SOUTH OF PILGRIMAGE OVERCROSSING TO ROUTE 101/170 SEPARATION.
QA Service Level1 (Verified on 07/16/2025)

Sample Information

Sample Taken Date08/18/2026 Sample Unique Key84
Date that the sample was received by the laboratory/organization performing the testing08/24/2026 Sample typeVerification
A brief description of the sampleAsphalt Rubber Binder The quantity of what the sample constitutes1can
From where was the sample collectedSource First name of sampler or witnessed byVICTOR
Last name of sampler or witnessed byPham Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameAAA-Irwindale
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplier
Performance GradePG 64-16 Lot number
Sublot number Asphalt Rubber Binder Mix Number

Test Details

DIME Sample ID: 2026-08-18-84
DIME Test ID: 2026-08-18-84-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D217-21: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Test Release Date: 2026-09-08

Test Results


Determination: Unworked Penetration
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 09/04/2026
Unworked Penetration, Test 1: 41 0.1 mm
Unworked Penetration, Test 2: 40 0.1 mm
Unworked Penetration, Test 3: 40 0.1 mm
Unworked Penetration: 40 0.1 mm
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 9/8/2026 ✔