Summary for Test 2026-08-10-79-3
Test performed: ASTM D5329-20Project Information
| Project Identifiers | Project ID: 209698 DEA: 072332E4 EFIS: 0700000391 COOP: 0705187 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-I-5-45.4/54 |
| Award Date | 07/01/2021 |
| Closeout Date | Not set |
| Work Description | Addition of 14 miles of HOV lanes in both directions would extend existing carpool lanes on the I- 5 in San Fernando Valley to Santa Clarita Valley |
| Location Description | The I-5 North Capacity Enhancements Project focuses on improvements to the I-5 freeway from cities of Santa Clarita and Castaic, beginning at the SR-14 interchange to Parker Rd. |
| QA Service Level | 2 (Verified on 02/03/2021) |
Sample Information
| Sample Taken Date | 08/10/2026 | Sample Unique Key | 79 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/19/2026 | Sample type | Verification |
| A brief description of the sample | Asphalt Rubber Binder | The quantity of what the sample constitutes | 1can |
| From where was the sample collected | Source | First name of sampler or witnessed by | Christopher |
| Last name of sampler or witnessed by | Hurtado | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Vulcan Sun Valley - Blvd. | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2026-08-10-79
DIME Test ID: 2026-08-10-79-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-20: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2026-09-04
Test Results
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 09/03/2026
Temperature: 25 C
Ball Penetration (P1): 3 mm
Final Dial reading (F1): 65 mm
Ball Penetration (P2): 1 mm
Final Dial reading (F2): 64 mm
Ball Penetration (P3): 2 mm
Final Dial reading (F3): 65 mm
Resilience 1: 38 %
Resilience 2: 37 %
Resilience 3: 37 %
Average Resilience: 37 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 9/4/2026 ✔
