Summary for Test 2026-08-26-22-5
Test performed: CTM 205-December 2010Project Information
| Project Identifiers | Project ID: 1002228 DEA: 051R7604 EFIS: 0524000115 |
|---|---|
| DIST-CO-RTE-PM | 05-SLO-229-5.5/9.2 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | RHMA-G overlay, asphalt rubber binder chip seal, & shoulder backing |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 05/01/2026) |
Sample Information
| Sample Taken Date | 08/26/2026 | Sample Unique Key | 22 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 08/26/2026 |
| Sample type | Acceptance | A brief description of the sample | Shoulder Backing Aggregate |
| The quantity of what the sample constitutes | ? | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Kyle | Last name of sampler or witnessed by | Engen |
| Title of sampler | QA Tester | Telephone number of sampler | |
| Laboratory sample identification | 260826-1 Shoulder Backing | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Calportland - Rockey Canyon | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-40-0013 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-08-26-22
DIME Test ID: 2026-08-26-22-5
Testing Lab: CT D05 - Paso Robles Field Laboratory
Test Method: CTM 205-December 2010: Method of Test for Determining Percentage of Crushed Particles
Test Release Date: 2026-08-27
Test Results
Will you be using 1/4 in. x No. 4 sieve?: No
Input Type: Calculated
Tester's full name: Kyle Engen
Date of test: 08/27/2026
Percent Coarse Crushed: 74 %
Percent Fine Crushed: 0 %
General comments (publicly viewable) (Max 1000 characters): 50 Spec 2-Face
Test was verified on 8/27/2026 ✔
