Summary for Test 2026-08-06-59-9
Test performed: AASHTO T301-22Project Information
| Project Identifiers | Project ID: 995520 DEA: 041Y7004 EFIS: 0423000016 |
|---|---|
| DIST-CO-RTE-PM | 04-CC,SOL-80-13.8/14.1,0.0/0.4 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | AL ZAMPA BRIDGE DECK REHABILITATION REPLACE TOP COURSE |
| Location Description | CONTRA COSTA AND SOLANO COUNTIES AT CROCKETT AND IN VALLEJO FROM UNION PACIFIC RAILROAD OVERHEAD TO 0.8 MILE SOUTH OF ROUTE 80/29 SEPARATION |
| QA Service Level | 1 (Verified on 12/06/2023) |
Sample Information
| Sample Taken Date | 08/06/2026 | Sample Unique Key | 59 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/10/2026 | Sample type | JMF Verification |
| A brief description of the sample | PG 88-16M | The quantity of what the sample constitutes | 1 gallon can |
| From where was the sample collected | Other | First name of sampler or witnessed by | Unknown (WITNESS) |
| Last name of sampler or witnessed by | Unknown (WITNESS) | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Martin Murietta- Berkley | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 88-16 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | PG 88-16M Tank #2 | |
| Time of sample | HMA Supplier | Martin Murietta- Berkley | |
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | 3/8" HMA-A, & #4 HMA-A | HMA Supplier Mix ID Number | 75S253-26L1, & 77S653-26L1 |
Test Details
DIME Sample ID: 2026-08-06-59
DIME Test ID: 2026-08-06-59-9
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T301-22: Standard Method of Test for Elastic Recovery Test of Asphalt Materials by Means of a Ductilometer
Test Release Date: 2026-08-27
Test Results
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 08/27/2026
Final Reading from the testing machine (X): 2.0 cm
% Elongation Recovery: 90 %
General comments (publicly viewable) (Max 1000 characters): ELASTIC RECOVERY
Test was verified on 8/27/2026 ✔
