Summary for Test 2026-08-14-38-5
Test performed: CTM 551-August 2012Project Information
| Project Identifiers | Project ID: 1002421 DEA: 033G2104 EFIS: 0323000222 |
|---|---|
| DIST-CO-RTE-PM | 03-UNKNOWN,PLA-,80- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | BRIDGE DECK REHAB RTE 20/80 NEVADA-PLACER: REMOVE & PLACE POLYESTER CONCRETE OVERLAY, JOINT SEAL (MR 1\\\\"), BONDED JOINT SEAL, RSC PATCH, REPAIR SPALLED AREAS, TREAT BRIDGE DECK, CLEAN & PAINT STRUCTURAL STEEL, THERMO STRIPING |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 08/17/2026) |
Sample Information
| Sample Taken Date | 08/14/2026 | Sample Unique Key | 38 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/17/2026 |
| Sample type | Quality Control | A brief description of the sample | 1 gallon can / PPC 1121 RESIN |
| The quantity of what the sample constitutes | 10 Tankers | From where was the sample collected | Source |
| First name of sampler or witnessed by | GILBERTO | Last name of sampler or witnessed by | GONZALEZ |
| Title of sampler | Quality Control Manager | Telephone number of sampler | 925-913-9199 |
| Laboratory sample identification | 26-028 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Kwik Bond Polymers, Benicia | Transportation Laboratory (TL) Number | 222KBP |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Polyester | Mfg. Lot Number(s) | AZ6H01237S |
|---|---|---|---|
| Batch Number | AZ6H01237S | Mix number | AZ6H01237S |
Test Details
DIME Sample ID: 2026-08-14-38
DIME Test ID: 2026-08-14-38-5
Testing Lab: CT HQ - Sacramento Concrete Testing Laboratory
Test Method: CTM 551-August 2012: Method of Test for Determining Suitability of Materials for Overlayment and Repair of Portland Cement Concrete Pavements and Structures
Test Release Date: 2026-08-27
Test Results
Input Type: Measured
Tester's full name: Gilberto Gonzalez
Date of test: 08/18/2026
Curing history for Sample 1: 24hr
Maximum applied load (P) for Sample 1: 980 lb
Span length for Sample 1: 9 in
Break location for Sample 1: bond
Specimen defects/notes for Sample 1: no data
Surface type for Sample 1: SSD
Modulus of rupture (R) for Sample 1: 490 psi
Curing history for Sample 2: 24hr
Maximum applied load (P) for Sample 2: 1442 lb
Span length for Sample 2: 9 in
Break location for Sample 2: bond
Specimen defects/notes for Sample 2: no data
Surface type for Sample 2: SSD
Modulus of rupture (R) for Sample 2: 721 psi
Curing history for Sample 3: 24hr
Maximum applied load (P) for Sample 3: 0 lb
Span length for Sample 3: 9 in
Break location for Sample 3: bond
Specimen defects/notes for Sample 3: no data
Surface type for Sample 3: SSD
Modulus of rupture (R) for Sample 3: 0 psi
General comments (publicly viewable) (Max 1000 characters): Accepted supplier's result.
Only two samples were tested.
Test was verified on 8/27/2026 ✔
