Summary for Test 2026-07-12-15-5
Test performed: CTM 389-19Project Information
| Project Identifiers | Project ID: 1000320 DEA: 11430324 EFIS: 1118000102 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-14.6/23.7 |
| Award Date | 08/23/2024 |
| Closeout Date | Not set |
| Work Description | MODIFY ELECTRICAL, CONCRETE PAVEMENT, DRAINAGE AND SIGNS. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM ROUTE 805/15 SEPARATION TO 0.1 MILE NORTH OF ROUTE 805/52 SEPARATION |
| QA Service Level | 1 (Verified on 09/09/2024) |
Sample Information
| Sample Taken Date | 07/12/2026 | Sample Unique Key | 15 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/13/2026 |
| Sample type | Production Start-Up | A brief description of the sample | PSU |
| The quantity of what the sample constitutes | 12 boxes | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Mohammed | Last name of sampler or witnessed by | Masud |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Marietta Lakeside | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | RHMA-G |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | 23418180AH | |
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | Valero | |
| RAP content (%) | 0 | WMA Additives | No |
| Antistrip type |
Test Details
DIME Sample ID: 2026-07-12-15
DIME Test ID: 2026-07-12-15-5
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 389-19: Method of Test for Hamburg Wheel-Track Testing of Compacted Hot Mix Asphalt
Test Release Date: 2026-08-26
Test Results
Specified number of passes at 12.7 mm: 20000
Specimen Preparation Method: PMLC
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 08/25/2026
Test Temperature: 122 F
Compaction Method: SGC Cylindrical Specimen
Air Void Content for specimen A-1: 6.1 %
Air Void Content for specimen A-2: 6.0 %
Air Void Content for specimen B-1: 6.4 %
Air Void Content for specimen B-2: 6.8 %
Stripping Inflection Point (Wheel A): >20000
Stripping Inflection Point (Wheel B): >20000
Maximum impression at 5000 passes (left wheel): 1.01 mm
Maximum impression at 5000 passes (right wheel): 1.09 mm
Average impression at 5000 passes (left/right avg): 1.05 mm
Maximum impression at 10000 passes (left wheel): 2.04 mm
Maximum impression at 10000 passes (right wheel): 4.35 mm
Average impression at 10000 passes (left/right avg): 3.2 mm
Maximum impression at 15000 passes (left wheel): 3.11 mm
Maximum impression at 15000 passes (right wheel): 7.94 mm
Average impression at 15000 passes (left/right avg): 5.53 mm
Maximum impression at 20000 passes (left wheel): 3.92 mm
Maximum impression at 20000 passes (right wheel): 10.47 mm
Average impression at 20000 passes (left/right avg): 7.2 mm
Maximum impression at 25000 passes (left wheel): no data
Maximum impression at 25000 passes (right wheel): no data
Average impression at 25000 passes (left/right avg): no data
Raw Data: excel
General comments (publicly viewable) (Max 1000 characters): Complies Target < 12.7 mm tested an Avg of 7.20 mm
Test was verified on 8/26/2026 ✔