Summary for Test 2026-08-12-59-2
Test performed: AASHTO T315-24Project Information
| Project Identifiers | Project ID: 1002260 DEA: 081N8104 EFIS: 0823000050 |
|---|---|
| DIST-CO-RTE-PM | 08-SBD-40-R135.9/R143.8 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | RHMA-open graded (OGFC), cold plane AC Pvmt, & replace AC Surf. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 06/02/2026) |
Sample Information
| Sample Taken Date | 08/12/2026 | Sample Unique Key | 59 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/13/2026 | Sample type | Verification |
| A brief description of the sample | Asphalt Binder Sample | The quantity of what the sample constitutes | 1can |
| From where was the sample collected | Source | First name of sampler or witnessed by | Francisco |
| Last name of sampler or witnessed by | Ruvaicaba | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Blue Diamond-Victorville | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | n/a | |
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | n/a | HMA Supplier Mix ID Number | n/a |
Test Details
DIME Sample ID: 2026-08-12-59
DIME Test ID: 2026-08-12-59-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T315-24: Standard Method of Test for Determining the Rheological Properties of Asphalt Binder Using a Dynamic Shear Rheometer (DSR) (Dynamic Shear)
Test Release Date: 2026-08-24
Test Results
Phase: RTFO residue
Input Type: Calculated
Tester's full name: Sunday Agude
Date of test: 08/24/2026
Phase Angle (δ) (for the 10 cycles): 84.3 degree
Dynamic Shear, G*/sin(δ): 3.78 kPa
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/24/2026 ✔
