Summary for Test 2025-12-15-62-1
Test performed: AASHTO T336-15Project Information
| Project Identifiers | Project ID: 1001375 DEA: 040A53T4 EFIS: 0421000155 COOP: 040A53TCM |
|---|---|
| DIST-CO-RTE-PM | 04-SOL-80-L1.8/L3.2 |
| Award Date | 06/20/2025 |
| Closeout Date | Not set |
| Work Description | Construct I-80 WB Truck Scales |
| Location Description | CONSTRUCTION ON STATE HIGHWAY IN SOLANO COUNTY IN AND NEAR FAIRFIELD ON ROUTE 12 FROM THE 80/12 EAST JUNCTION TO 0.9 MILE EAST OF CHADBOURNE ROAD UNDERCROSSING AND ON ROUTE 80 FROM 0.5 MILE WEST OF DAN WILSON CREEK BRIDGE TO WEST TEXAS STREET UNDERCROSSI |
| QA Service Level | 1 (Verified on 07/10/2025) |
Sample Information
| Sample Taken Date | 12/15/2025 | Sample Unique Key | 62 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 12/16/2025 |
| Sample type | Per Request | A brief description of the sample | 4x8 cylinders |
| The quantity of what the sample constitutes | 2 | From where was the sample collected | Source |
| First name of sampler or witnessed by | Jaime | Last name of sampler or witnessed by | Galvan |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Cemex Fairfield | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 1635786 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 0 | |
| Concrete batch plant | Cemex Fairfield | The fabricator/manufacturer designation for the sample | |
| A detailed description of where the material sample was collected | Batch Plant | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2025-12-15-62
DIME Test ID: 2025-12-15-62-1
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: AASHTO T336-15: Standard Method of Test for Coefficient of Thermal Expansion of Hydraulic Cement Concrete
Test Release Date: 2026-08-17
Test Results
Input Type: Calculated
Tester's full name: Mario Salazar
Date of test: 01/12/2026
Average CTE: 0.000009862 mm/mm/°C
Average CTE: 5.479E-6 in/in/°F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/17/2026 ✔
