Summary for Test 2026-08-13-30-2
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 1002227 DEA: 051S6304 EFIS: 0525000068 |
|---|---|
| DIST-CO-RTE-PM | 05-UNKNOWN--unknown |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 06/08/2026) |
Sample Information
| Sample Taken Date | 08/13/2026 | Sample Unique Key | 30 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/13/2026 |
| Sample type | Acceptance | A brief description of the sample | Type II Slurry Seal Aggregate |
| The quantity of what the sample constitutes | 8/13/26 Paving | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Austin | Last name of sampler or witnessed by | Kirby |
| Title of sampler | CT Tester | Telephone number of sampler | |
| Laboratory sample identification | 260813 Slurry Seal - Type II | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Graniterock - Wilson Quarry | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-35-0012 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Conveyor Belt | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | fine | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-08-13-30
DIME Test ID: 2026-08-13-30-2
Testing Lab: CT D05 - Paso Robles Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2026-08-14
Test Results
Number of tests: 1
Input Type: Measured
Tester's full name: Kyle Engen
Date of test: 08/14/2026
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 6.6
Sand reading (test 1): 3.9
Sand equivalent (test 1): 60
Sand equivalent before temperature correction: 60
Sand equivalent after temperature correction: 60
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/14/2026 ✔
