Summary for Test 2026-07-27-85-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1002405 DEA: 022K1804 EFIS: 0225000048 |
|---|---|
| DIST-CO-RTE-PM | 02-SIS-96- |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | HAPPY CAMP 2026 - RTE 96 PAVEMENT REHAB: SHOULDER BACKING, REPLACE AC SURFACING, HMA (TYPE A), TACK COAT, COLD PLANE, REMOVE MARKERS/THERMO, 6\\\\"/8\\\\" MMA PAINT TRAFFIC STRIPE & CROSSWALK MARKING |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 07/13/2026) |
Sample Information
| Sample Taken Date | 07/27/2026 | Sample Unique Key | 85 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/27/2026 |
| Sample type | Production Start-Up | A brief description of the sample | 2 Bags RAP |
| The quantity of what the sample constitutes | Production Start Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Delgado |
| Title of sampler | Consultant | Telephone number of sampler | |
| Laboratory sample identification | D80311B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | JF Shea Construction - Fawndale Rock and Asphalt - Redding, CA | Transportation Laboratory (TL) Number | 846260 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Fawndale Rock and Asphalt, Redding, CA |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2026-07-27-85
DIME Test ID: 2026-07-27-85-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-08-13
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 08/03/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 3019.5 g
Mass of the specimen and specimen basket assembly prior to ignition: 4557.9 g
Mass of HMA Sample prior to ignition: 1538.4 g
Mass Loss: 84.9 g
Mass of aggregate remaining after ignition: 1453.5 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.20 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.32 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=5.32,
Pbr≈3.97
Test was verified on 8/13/2026 ✔
