Summary for Test 2026-07-24-39-2
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1002030 DEA: 020J7604 EFIS: 0219000157 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-3-67.7/T85.06 |
| Award Date | 02/18/2026 |
| Closeout Date | Not set |
| Work Description | Tangle Blue CAPM |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/06/2026) |
Sample Information
| Sample Taken Date | 07/24/2026 | Sample Unique Key | 39 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/27/2026 |
| Sample type | Production Start-Up | A brief description of the sample | 4 Bags of Combined Lime Treated 1/2-inch Virgin Aggregate |
| The quantity of what the sample constitutes | Production Start Up Evaluation | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Joe | Last name of sampler or witnessed by | Delgado |
| Title of sampler | Consultant | Telephone number of sampler | |
| Laboratory sample identification | D80306B | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Tullis — Northstate Asphalt (Redding, CA) — Latona Aggregates (Anderson, CA) | Transportation Laboratory (TL) Number | 846253 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | Tullis |
|---|---|---|---|
| Aggregate Size | Aggregate Source | ||
| RAP Stockpile | Stockpile Size (tons) | ||
| Reclaimed Asphalt Pavement Mix Number |
Test Details
DIME Sample ID: 2026-07-24-39
DIME Test ID: 2026-07-24-39-2
Testing Lab: CT D02 - Redding Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-08-13
Test Results
What temperature unit is used?: Celsius
Input Type: Measured
Tester's full name: Sean McWithey
Date of test: 07/29/2026
Test procedure used?: Method A
Mass of the specimen basket assembly: 3019.8 g
Mass of the specimen and specimen basket assembly prior to ignition: 4702.9 g
Mass of HMA Sample prior to ignition: 1683.1 g
Mass Loss: 80.9 g
Mass of aggregate remaining after ignition: 1602.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.00 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.18 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 4.63 %
General comments (publicly viewable) (Max 1000 characters): Pbr(uncorrected)=4.63%,
Pbr≈3.76%
Test was verified on 8/13/2026 ✔
