Summary for Test 2026-07-26-16-2
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000777 DEA: 07370404 EFIS: 0720000128 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-5-R59.5/R73.7 |
| Award Date | 02/06/2025 |
| Closeout Date | Not set |
| Work Description | COLD PLANE AC PAVEMENT, PLACE HOT MIX ASPHALT AND INSTALL MGS. |
| Location Description | LOS ANGELES COUNTY FROM LAKE HUGHES ROAD UNDERCROSSING TO 0.7 MILE SOUTH OF VISTA DEL LAGO ROAD OVERCROSSING. |
| QA Service Level | 1 (Verified on 11/25/2024) |
Sample Information
| Sample Taken Date | 07/26/2026 | Sample Unique Key | 16 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/29/2026 | Sample type | Verification |
| A brief description of the sample | Asphalt Binder Sample | The quantity of what the sample constitutes | 1can |
| From where was the sample collected | Source | First name of sampler or witnessed by | Stuwart Ahumada (QC) |
| Last name of sampler or witnessed by | Ahumada | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Griffith Edmonston | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 58-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | n/a | |
| Certified Asphalt Supplier | San Joaquin Refinery - Bakersfield CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | n/a | HMA Supplier Mix ID Number | n/a |
Test Details
DIME Sample ID: 2026-07-26-16
DIME Test ID: 2026-07-26-16-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-08-19
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 08/12/2026
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 203.299 grams
Mass of container #2 before test (m2i): 207.976 grams
Mass of container #1 after test (m1f): 203.288 grams
Mass of container #2 after test (m2f): 207.963 grams
Mass of empty container #1: 168.212 grams
Mass of empty container #2: 172.824 grams
Mass correction factor: 0.006
Average mass change: -0.028 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 8/19/2026 ✔
