Summary for Test 2026-07-30-72-3
Test performed: ASTM D5329-20Project Information
| Project Identifiers | Project ID: 1001306 DEA: 023H7704 EFIS: 0218000039 |
|---|---|
| DIST-CO-RTE-PM | 02-TEH-99-0.0/12.5 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | VINA REHAB: PLACE HMA, INSTALL CULVERTS, AND INSTALL GUARDRAIL. |
| Location Description | TEHAMA COUNTY IN AND NEAR LOS MOLINOS FROM BUTTE COUNTY LINE TO LOS MOLINOS CREEK BRIDGE |
| QA Service Level | 1 (Verified on 06/12/2025) |
Sample Information
| Sample Taken Date | 07/30/2026 | Sample Unique Key | 72 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/10/2026 |
| Sample type | Production Start-Up | A brief description of the sample | PG 64-16 Rubber Blend |
| The quantity of what the sample constitutes | 2 Quart Cans | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Tanner | Last name of sampler or witnessed by | CGI |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | JF Shea - Fawndale | Transportation Laboratory (TL) Number | 681709 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 681709 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | American Pavement Systems |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number | 25540 |
Test Details
DIME Sample ID: 2026-07-30-72
DIME Test ID: 2026-07-30-72-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D5329-20: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2026-08-12
Test Results
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 08/12/2026
Temperature: 25 C
Ball Penetration (P1): 8 mm
Final Dial reading (F1): 66 mm
Ball Penetration (P2): 5 mm
Final Dial reading (F2): 64 mm
Ball Penetration (P3): 6 mm
Final Dial reading (F3): 65 mm
Resilience 1: 42 %
Resilience 2: 41 %
Resilience 3: 41 %
Average Resilience: 41 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters): RESILIENCE REBOUND
Test was verified on 8/12/2026 ✔
