Summary for Test 2026-07-10-38-3

Test performed: AASHTO T30-25

Project Information

Project IdentifiersProject ID: 1000232
DEA: 09392304
DIST-CO-RTE-PM09-MNO-120,182-Var
Award DateNot set
Closeout DateNot set
Work DescriptionRECYCLE PAVEMENT, PLACE HMA, AND INSTALL GUARDRAIL.
Location DescriptionMONO COUNTY AT VARIOUS LOCATIONS
QA Service Level1 (Verified on 04/15/2024)

Sample Information

Sample Taken Date07/10/2026 Sample Unique Key38
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/10/2026
Sample typeVerification A brief description of the sample1/2" Coldfeed & RAP
The quantity of what the sample constitutesJMF Re Verification Testing From where was the sample collectedSource
First name of sampler or witnessed byDerek Last name of sampler or witnessed byCarrington
Title of samplerMREA S Telephone number of sampler
Laboratory sample identificationJMF RN 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameGranite Lee Vining Hot Plant Transportation Laboratory (TL) Number5479
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)91-26-0029
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedSample Device on Plant
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size1/2 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2026-07-10-38
DIME Test ID: 2026-07-10-38-3
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: AASHTO T30-25: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2026-08-11

Test Results


Individual or cumulative mass retained on each sieve?: Cumulative Mass Retained
Has the fine aggregate sample been reduced?: No
Is an aggregate correction factor used?: Yes
Was the aggregate obtained using ASTM D8159?: No
Input Type: Measured
Tester's full name: Derek Carrington
Date of test: 07/10/2026
Total mass of material in the sample: 1524.6 grams
Cumulative mass retained on the 2 in. sieve: 0.0 grams
Cumulative mass retained on the 1 1/2 in. sieve: 0.0 grams
Cumulative mass retained on the 1 in. sieve: 0.0 grams
Cumulative mass retained on the 3/4 in. sieve: 0.0 grams
Cumulative mass retained on the 1/2 in. sieve: 0.0 grams
Cumulative mass retained on the 3/8 in. sieve: 25.8 grams
Cumulative mass retained on the #4 sieve: 519.3 grams
Cumulative mass retained on the #8 sieve: 806.8 grams
Cumulative mass retained on the #16 sieve: 999.3 grams
Cumulative mass retained on the #30 sieve: 1125.6 grams
Cumulative mass retained on the #50 sieve: 1251.4 grams
Cumulative mass retained on the #100 sieve: 1340.8 grams
Cumulative mass retained on the #200 sieve: 1395.9 grams
Cumulative mass retained on the pan: 1406.2 grams
Aggregate correction factor for the 2 in. sieve (% passing): 0.0 %
Aggregate correction factor for the 1 1/2 in. sieve (% passing): 0.0 %
Aggregate correction factor for the 1 in. sieve (% passing): 0.0 %
Aggregate correction factor for the 3/4 in. sieve (% passing): 0.0 %
Aggregate correction factor for the 1/2 in. sieve (% passing): 0.0 %
Aggregate correction factor for the 3/8 in. sieve (% passing): -0.1 %
Aggregate correction factor for the #4 sieve (% passing): 5.2 %
Aggregate correction factor for the #8 sieve (% passing): 2.3 %
Aggregate correction factor for the #16 sieve (% passing): -1.1 %
Aggregate correction factor for the #30 sieve (% passing): -5.6 %
Aggregate correction factor for the #50 sieve (% passing): -4.2 %
Aggregate correction factor for the #100 sieve (% passing): -2.2 %
Aggregate correction factor for the #200 sieve (% passing): -1.3 %
Cumulative percent passing the 2 in. sieve: 100 %
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 98 %
Cumulative percent passing the #4 sieve: 71 %
Cumulative percent passing the #8 sieve: 49 %
Cumulative percent passing the #16 sieve: 33 %
Cumulative percent passing the #30 sieve: 21 %
Cumulative percent passing the #50 sieve: 14 %
Cumulative percent passing the #100 sieve: 10 %
Cumulative percent passing the #200 sieve: 7.1 %
General comments (publicly viewable) (Max 1000 characters): JMF-01 RAP

Test was verified on 8/11/2026