Summary for Test 2026-08-06-4-1
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 1001687 DEA: 11430344 EFIS: 1118000104 COOP: NONE |
|---|---|
| DIST-CO-RTE-PM | 11-SD-5,54,94,125-Var |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | CULVERTS RESTORATION, RHMA, JPCP, ISR, BARRIER, LANDSCAPE, ELECTRICAL. |
| Location Description | SAN DIEGO COUNTY AT VARIOUS LOCATIONS |
| QA Service Level | 1 (Verified on 02/05/2026) |
Sample Information
| Sample Taken Date | 08/06/2026 | Sample Unique Key | 4 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/06/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Structure Backfill |
| The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Daniel Paul | Last name of sampler or witnessed by | Smith |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Soil | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-08-06-4
DIME Test ID: 2026-08-06-4-1
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2026-08-10
Test Results
Is oversize material: No
Input Type: Measured
Tester's full name: Daniel Smith
Date of test: 08/06/2026
In-place wet density: 2.14
Highest adjust wet density: 2.24
% Moisture: 13.2 %
Optimum Moisture: 13.0 %
Relative compaction: 96
General comments (publicly viewable) (Max 1000 characters): Complies Target for Structure Backfill ( Pipe ) 95% - Tested 96 %
Test was verified on 8/10/2026 ✔
