Summary for Test 2026-07-16-39-6
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000561 DEA: 010J8904 EFIS: 0119000119 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-36-3.9/6.0 |
| Award Date | 12/06/2024 |
| Closeout Date | Not set |
| Work Description | HOT MIX ASPHALT, AGGREGATE BASE, AND STRUCTURAL CONCRETE. |
| Location Description | HUMBOLDT COUNTY AT CARLOTTA FROM 0.2 MILE WEST OF FISHER ROAD TO 0.2 MILE WEST OF WILDER ROAD |
| QA Service Level | 1 (Verified on 09/23/2024) |
Sample Information
| Sample Taken Date | 07/16/2026 | Sample Unique Key | 39 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/21/2026 | Sample type | Production Start-Up |
| A brief description of the sample | 1 can of PG 64-28M | The quantity of what the sample constitutes | 1 can |
| From where was the sample collected | Source | First name of sampler or witnessed by | CHASE |
| Last name of sampler or witnessed by | PETERSON | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | MERCER FRASER-FORTUNA | |
| Transportation Laboratory (TL) Number | 544554 | Inspector Lot Number from the Transportation Laboratory (TL) Form | 544554 |
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-28 M |
|---|---|---|---|
| Modified | Yes | Lot number | 26139 |
| Sublot number | 26139 | Tank number | |
| Time of sample | HMA Supplier | MERCER FRASER- FORTUNA | |
| Certified Asphalt Supplier | Western Emulsions - White City Emulsion Plant - White City OR | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | 1/2" HMA-0 | HMA Supplier Mix ID Number | NOT ON TL-101 |
Test Details
DIME Sample ID: 2026-07-16-39
DIME Test ID: 2026-07-16-39-6
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-08-05
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 08/05/2026
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 203.243 grams
Mass of container #2 before test (m2i): 207.825 grams
Mass of container #1 after test (m1f): 203.124 grams
Mass of container #2 after test (m2f): 207.706 grams
Mass of empty container #1: 168.210 grams
Mass of empty container #2: 172.823 grams
Mass correction factor: 0.006
Average mass change: -0.334 percent
General comments (publicly viewable) (Max 1000 characters): MASS CHANGE
Test was verified on 8/5/2026 ✔
