Summary for Test 2026-05-19-91-2
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 1001723 DEA: 050N7064 EFIS: 0524000077 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-101-10.9/12.3 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | SB 101 - Segment 4E North - Cabrillo |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 11/03/2025) |
Sample Information
| Sample Taken Date | 05/19/2026 | Sample Unique Key | 91 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/19/2026 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4 HMA-A SP R25 Aggregates |
| The quantity of what the sample constitutes | 60 Tons | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Bryan | Last name of sampler or witnessed by | Stewart |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Granite Santa Paula | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-56-0032 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | Plant Deposited Pile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 3/4 inch | |
| The concrete mix design number | Lot number | ||
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-05-19-91
DIME Test ID: 2026-05-19-91-2
Testing Lab: CT D05 - Carpinteria Field Laboratory
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2026-07-28
Test Results
Number of tests: 3
Input Type: Measured
Tester's full name: Bryan Stewart
Date of test: 05/19/2026
Temperature correction: 0
Temperature of solution: 72
Clay reading (test 1): 5.1
Sand reading (test 1): 4.2
Clay reading (test 2): 5
Sand reading (test 2): 4
Clay reading (test 3): 5.5
Sand reading (test 3): 4.2
Sand equivalent (test 1): 83
Sand equivalent (test 2): 80
Sand equivalent (test 3): 77
Sand equivalent before temperature correction: 80
Sand equivalent after temperature correction: 80
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/28/2026 ✔
