Summary for Test 2026-07-13-58-2
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 995085 DEA: 07322904 EFIS: 0716000059 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-27-0.0/18.6 |
| Award Date | 11/06/2023 |
| Closeout Date | Not set |
| Work Description | REMOVE EXISTING AC PAVEMENT & HMA OVERLAY. |
| Location Description | LOS ANGELES COUNTY IN AND NEAR LOS ANGELES FROM ROUTE 1 TO DEVONSHIRE STREET |
| QA Service Level | 1 (Verified on 09/11/2023) |
Sample Information
| Sample Taken Date | 07/13/2026 | Sample Unique Key | 58 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/20/2026 |
| Sample type | Verification | A brief description of the sample | JMF Verification |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | John Mejia | Last name of sampler or witnessed by | Mejia |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Vulcan-Sun Valley | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | N/A | |
| Certified Asphalt Supplier | Valero Wilmington Refinery - Wilmington CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | N/A | HMA Supplier Mix ID Number | N/A |
Test Details
DIME Sample ID: 2026-07-13-58
DIME Test ID: 2026-07-13-58-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-07-28
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 07/27/2026
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 203.272 grams
Mass of container #2 before test (m2i): 207.879 grams
Mass of container #1 after test (m1f): 203.087 grams
Mass of container #2 after test (m2f): 207.694 grams
Mass of empty container #1: 168.210 grams
Mass of empty container #2: 172.822 grams
Mass correction factor: 0.006
Average mass change: -0.522 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/28/2026 ✔
