Summary for Test 2026-07-13-50-1
Test performed: AASHTO T308-10Project Information
| Project Identifiers | Project ID: 1002452 DEA: 033G7804 EFIS: 0325000109 |
|---|---|
| DIST-CO-RTE-PM | 03-YUB-YUB-070 -unkn8.46/13.6 own |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | 0.10' Cold Plane and RHMA-G |
| Location Description | IN YUBA COUNTY AT OLIVEHURST AND LINDA FROM ROUTE 65/70 SEPARATION TO YUBA RIVER BRIDGE |
| QA Service Level | NOT VERIFIED |
Sample Information
| Sample Taken Date | 07/13/2026 | Sample Unique Key | 50 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/17/2026 |
| Sample type | Quality Assurance | A brief description of the sample | 1/2" RHMA-O |
| The quantity of what the sample constitutes | 2 Boxes | From where was the sample collected | Source |
| First name of sampler or witnessed by | Brad | Last name of sampler or witnessed by | Mckeehan |
| Title of sampler | TET | Telephone number of sampler | |
| Laboratory sample identification | Daily Sample 26-149 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Teichert Hallwood | Transportation Laboratory (TL) Number | C955852 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | OGFC |
|---|---|---|---|
| HMA Grading | 1/2 inch | Lot number | 1 |
| Sublot number | 2 | HMA Mix Number | 30940542600P |
| Binder content (%) | 7.2 | Virgin binder PG | PG 64-16 |
| Design binder PG | PG 64-16 | Binder Supplier | PNW |
| RAP content (%) | 0 | WMA Additives | No |
| Antistrip type |
Test Details
DIME Sample ID: 2026-07-13-50
DIME Test ID: 2026-07-13-50-1
Testing Lab: CT D03 - Olivehurst Northern Regional Laboratory
Test Method: AASHTO T308-10: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-07-24
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Joshua Wilson
Date of test: 07/22/2026
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2129.0 g
Mass Loss: 156.6 g
Correction Factor (Percent by mass of HMA Specimen): 0.38 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.02 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 6.93 %
General comments (publicly viewable) (Max 1000 characters): R1
OBC 7.2%
Test was verified on 7/24/2026 ✔
