Summary for Test 2026-05-28-3-2

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1002169
DEA: 051S3304
EFIS: 0524000215
DIST-CO-RTE-PM05-SB-101-12.3/13.49
Award Date03/25/2026
Closeout DateNot set
Work DescriptionNot set
Location DescriptionNot set
QA Service Level1 (Verified on 04/28/2026)

Sample Information

Sample Taken Date05/28/2026 Sample Unique Key3
Date that the sample was received by the laboratory/organization performing the testing05/28/2026 Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesTrial Slab and Multiple Lanes
From where was the sample collectedJob Site First name of sampler or witnessed byRaymond
Last name of sampler or witnessed byBarajas Title of samplerRaymond Barajas
Telephone number of sampler805-441-6932 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameVelarde Concrete Construction
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier51-0332 Structure nameSycamore Creek
Bid Item3952907

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedStationary Lane Closure DIST-CO-RTE05-SB-101
Direction of TravelSouth Post Mile12.30
Lanes to be TestedShoulder Station

Test Details

DIME Sample ID: 2026-05-28-3
DIME Test ID: 2026-05-28-3-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-08-04

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 07/22/2026
Air Temperature: 65
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: END OF BRIDGE
Edge used to measure position: RIGHT OF WALL
Reference Distance 1: 30
Reference Distance 2: 33
Reference Distance 3: 36
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 19
Position for Stationing 2: 19
Position for Stationing 3: 19
Percent Grade for 1st Stationing: 1.0
Percent Grade for 2nd Stationing: 1.0
Percent Grade for 3rd Stationing: 1.0
Corrected Coefficients of Friction for Stationing 1: 0.41
Corrected Coefficients of Friction for Stationing 2: 0.41
Corrected Coefficients of Friction for Stationing 3: 0.41
Average Coefficient of Friction: 0.41
General comments (publicly viewable) (Max 1000 characters): BRIDGE # 51-0335 VISUALLY INSPECTED SYCAMORE BRIDGE/MILPAS BRIDGE. EVERYTHING LOOKED UNIFORMED AND JUST LIKE THIS BRIDGE. THIS BRIDGE USED AS TRIAL SLAB FOR THE BRIDGES GOING NB

Test was verified on 8/4/2026 ✔