Summary for Test 2026-05-28-4-2

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 994326
DEA: 051C3604
EFIS: 0512000134
DIST-CO-RTE-PM05-SB-217-0.9/1.4
Award Date01/31/2023
Closeout DateNot set
Work DescriptionREPLACE BRIDGE.
Location DescriptionSANTA BARBARA COUNTY NEAR GOLETA FROM 0.2 MILE EAST OF GOLETA SLOUGH BRIDGE TO 0.4 MILE EAST OF SAN JOSE CREEK BRIDGE
QA Service Level1 (Verified on 10/17/2022)

Sample Information

Sample Taken Date05/28/2026 Sample Unique Key4
Date that the sample was received by the laboratory/organization performing the testing05/28/2026 Sample typeAcceptance
A brief description of the sampleSkid Testing Request The quantity of what the sample constitutesMultiple Lanes
From where was the sample collectedJob Site First name of sampler or witnessed byRaymond
Last name of sampler or witnessed byBarajas Title of samplerRaymond Barajas
Telephone number of sampler805-441-6932 Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameMCM Construction
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier51-0362 Structure nameSan Jose Creek Bridge
Bid Item3855706

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE05-SB-217
Direction of TravelWest Post Mile1.02
Lanes to be TestedLane #1,Lane #2 Station

Test Details

DIME Sample ID: 2026-05-28-4
DIME Test ID: 2026-05-28-4-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-08-04

Test Results


Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 07/22/2026
Air Temperature: 65 F
Tire Pressure: 25 psi
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: NB: Northbound Direction of Travel
Edge used to measure reference distance: BEGINING OF BRIDGE
Edge used to measure position: RIGHT OF WALL
Reference Distance 1: 50 ft
Reference Distance 2: 53 ft
Reference Distance 3: 56 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 15 ft
Position for Stationing 2: 15 ft
Position for Stationing 3: 15 ft
Percent Grade for 1st Stationing: 0.0 %
Percent Grade for 2nd Stationing: 0.0 %
Percent Grade for 3rd Stationing: 0.0 %
Corrected Coefficients of Friction for Stationing 1: 0.47
Corrected Coefficients of Friction for Stationing 2: 0.47
Corrected Coefficients of Friction for Stationing 3: 0.47
Average Coefficient of Friction: 0.47
General comments (publicly viewable) (Max 1000 characters): SAN JOSE CREEK BRIDGE. VISUALLY INSPECTED ENTIRE BRIDGE AS WELL AS SB DIRECTION. ALL LOOKS UNIFORMED.

Test was verified on 8/4/2026 ✔