Summary for Test 2026-07-17-26-3
Test performed: CTM 557-July 2012Project Information
| Project Identifiers | Project ID: 1001608 DEA: 01464804 EFIS: 0100000266 |
|---|---|
| DIST-CO-RTE-PM | 01-HUM-101-1.1/2.5 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | INSTALL SOLDIER PILE WALL, AND REMOVE AND REPLACE ROADWAY SECTION. |
| Location Description | HUMBOLDT COUNTY NEAR GARBERVILLE FROM 0.5 MILE SOUTH TO 0.9 MILE NORTH OF RICHARDSON GROVE UNDERCROSSING |
| QA Service Level | 1 (Verified on 09/19/2025) |
Sample Information
| Sample Taken Date | 07/17/2026 | Sample Unique Key | 26 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 07/20/2026 | Sample type | Quality Control |
| A brief description of the sample | PCC | The quantity of what the sample constitutes | 95 CY |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Andrew |
| Last name of sampler or witnessed by | Grinsell | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Mercer-Fraser — Plant B (Fortuna, CA) | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | MFSCL1675.45 4500 PSI |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 115016 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Discharge from concrete truck into wheelbarrow | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-07-17-26
DIME Test ID: 2026-07-17-26-3
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: CTM 557-July 2012: Method of Test for Temperature of Freshly Mixed Portland Cement Concrete
Test Release Date: 2026-07-20
Test Results
Input Type: Calculated
Tester's full name: Andrew Grinsell
Date of test: 07/17/2026
Temperature of the freshly mixed concrete: 69 F
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/20/2026 ✔
