Summary for Test 2026-07-16-8-3

Test performed: CTM 229-June 2011

Project Information

Project IdentifiersProject ID: 1001372
DEA: 09374504
EFIS: 0918000017
DIST-CO-RTE-PM09-INY-395-56.8/57.4,57.9/R58.3
Award Date09/19/2025
Closeout DateNot set
Work DescriptionCONSTRUCT SIDEWALK, CURB RAMPS, AND DRAINAGE.
Location DescriptionINYO COUNTY AT AND NEAR LONE PINE FROM TEYA ROAD TO EAST INYO STREET AND FROM BEGOLE STREET TO EAST LUBKEN AVENUE
QA Service Level1 (Verified on 08/06/2025)

Sample Information

Sample Taken Date07/16/2026 Sample Unique Key8
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing07/16/2026
Sample typeQuality Assurance A brief description of the sampleClass 2 base
The quantity of what the sample constitutesTwo bags of aggregate From where was the sample collectedJob Site
First name of sampler or witnessed byDarrell Last name of sampler or witnessed byBiederman
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameCHC Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeAggregate Source Identification (SMARA, name of Pit or Job Site)CHC STOCKPILE
The fabricator's/manufacturer's product name for the sample The fabricator/manufacturer designation for the sample
The plant number A detailed description of where the material sample was collectedCHC STOCKPILE Lone Pine
Where the material sample would have been placed if not sampled Primary Aggregate Nominal Size3/4 inch
The concrete mix design number Lot number
Sublot number Aggregate Mix Number

Test Details

DIME Sample ID: 2026-07-16-8
DIME Test ID: 2026-07-16-8-3
Testing Lab: CT D09 - Bishop Field Laboratory
Test Method: CTM 229-June 2011: Method of Test for Durability Index
Test Release Date: 2026-07-20

Test Results


What test(s) are being run?: Coarse durability only
Input Type: Calculated
Tester's full name: Derek Carrington
Date of test: 07/17/2026
Coarse durability index: 93
General comments (publicly viewable) (Max 1000 characters): AB-02

Test was verified on 7/20/2026