Summary for Test 2026-07-15-9-2
Test performed: CTM 216-June 2011Project Information
| Project Identifiers | Project ID: 1001625 DEA: 11173704 EFIS: 1100020255 |
|---|---|
| DIST-CO-RTE-PM | 11-SD-805-2.6/3.2 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | WIDEN INTERCHANGE, STRUCTURES, HMA-A, RHMA-G, LANDSCAPE, & ELECTRICAL. |
| Location Description | SAN DIEGO COUNTY IN SAN DIEGO FROM 0.3 MILE SOUTH TO 0.3 MILE NORTH OF PALM AVENUE OVERCROSSING |
| QA Service Level | 1 (Verified on 03/04/2026) |
Sample Information
| Sample Taken Date | 07/15/2026 | Sample Unique Key | 9 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 07/15/2026 |
| Sample type | Quality Assurance | A brief description of the sample | Soil |
| The quantity of what the sample constitutes | 1 bag | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Mohammed | Last name of sampler or witnessed by | Masud |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Soil | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Soil | The fabricator's/manufacturer's product name for the sample | |
|---|---|---|---|
| The fabricator/manufacturer designation for the sample | A detailed description of where the material sample was collected | Jobsite | |
| Where the material sample would have been placed if not sampled |
Test Details
DIME Sample ID: 2026-07-15-9
DIME Test ID: 2026-07-15-9-2
Testing Lab: CT D11 - District 11 Materials Laboratory
Test Method: CTM 216-June 2011: Method of Test for Relative Compaction of Untreated and Treated Soils and Aggregates
Test Release Date: 2026-07-16
Test Results
Is oversize material: Yes
Input Type: Calculated
Tester's full name: Daniel Smith
Date of test: 07/16/2026
In-place wet density: 2.14
% Moisture: 13.8 %
Optimum Moisture: 16.0 %
Corrected density: 2.25
Relative compaction: 95
General comments (publicly viewable) (Max 1000 characters): Complies Target 95.0 % / Tested Abutment 3 Structure Backfill
Test was verified on 7/16/2026 ✔
