Summary for Test 2026-03-11-98-3

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 1001910
DEA: 044X5304
EFIS: 0426000087
COOP: NONE
DIST-CO-RTE-PM04-NAP-29-23.54/23.54
Award DateNot set
Closeout DateNot set
Work DescriptionREMOVE AND EXISTING CULVERT AND REPLACE WITH CAST IN PLACE BOX CULVERT AND REPAIR ROADWAY REPLACE CULVERT AND REPAIR ROADWAY
Location DescriptionIN NAPA CO. HWY 29 PM 23.54
QA Service Level1 (Verified on 01/16/2026)

Sample Information

Sample Taken Date03/11/2026 Sample Unique Key98
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing03/12/2026
Sample typeQuality Control A brief description of the sample4x8 Cylinders
The quantity of what the sample constitutes15 From where was the sample collectedJob Site
First name of sampler or witnessed byAmy Last name of sampler or witnessed byMuela
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identification475115E1 Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameShamrock Materials Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameCulvert Base Slab Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number475115E1
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected0
Concrete batch plantShamrock Materials The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedCulvert Base Slab Where the material sample would have been placed if not sampled
From Lot No.1 Bag Lot No.1

Test Details

DIME Sample ID: 2026-03-11-98
DIME Test ID: 2026-03-11-98-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-07-17

Test Results


Input Type: Calculated
Tester's full name: Amy Muela
Date of test: 03/11/2026
Air Content: 1.9 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/17/2026