Summary for Test 2026-02-13-82-2
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 1001910 DEA: 044X5304 EFIS: 0426000087 COOP: NONE |
|---|---|
| DIST-CO-RTE-PM | 04-NAP-29-23.54/23.54 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | REMOVE AND EXISTING CULVERT AND REPLACE WITH CAST IN PLACE BOX CULVERT AND REPAIR ROADWAY REPLACE CULVERT AND REPAIR ROADWAY |
| Location Description | IN NAPA CO. HWY 29 PM 23.54 |
| QA Service Level | 1 (Verified on 01/16/2026) |
Sample Information
| Sample Taken Date | 02/13/2026 | Sample Unique Key | 82 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/15/2026 |
| Sample type | Quality Control | A brief description of the sample | 4x8 Cylinders |
| The quantity of what the sample constitutes | 20 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Mitchell | Last name of sampler or witnessed by | Whitlock |
| Title of sampler | QC Field Technician | Telephone number of sampler | |
| Laboratory sample identification | 475115E1 Set 1 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Shamrock Materials | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Truck 2446 | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 475115E1 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | Shamrock Materials | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | Truck 2446 | Where the material sample would have been placed if not sampled | |
| From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2026-02-13-82
DIME Test ID: 2026-02-13-82-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2026-07-17
Test Results
Input Type: Calculated
Tester's full name: Mitchell Whitlock
Date of test: 02/13/2026
Unit weight of the concrete: 150.9 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/17/2026 ✔
