Summary for Test 2026-05-11-66-2

Test performed: CTM TEMP1-16

Project Information

Project IdentifiersProject ID: 1000680
DEA: 051G9504
EFIS: 0516000005
DIST-CO-RTE-PM05-SCR-9-9.0/25.5
Award Date06/13/2025
Closeout DateNot set
Work DescriptionDRAINAGE SYSTEM UPGRADES AND SLOPE STABILIZATION AT INLETS & OUTLETS.
Location DescriptionSANTA CRUZ COUNTY NEAR BEN LOMOND AT VARIOUS LOCATIONS FROM SCENIC WAY TO 4.7 MILES NORTH OF THE NORTHERN JUNCTION OF ROUTES 9/236.
QA Service Level1 (Verified on 10/10/2024)

Sample Information

Sample Taken Date05/11/2026 Sample Unique Key66
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/11/2026
Sample typeQuality Control A brief description of the sampleConcrete testing cylinders - Mix 12B Precast
The quantity of what the sample constitutes1 pipe From where was the sample collectedManufacturer
First name of sampler or witnessed byWilfredo Last name of sampler or witnessed byBucaneg
Title of sampler Telephone number of sampler
Laboratory sample identification Linked DIME Sample ID
The fabricator/manufacturer/facility nameRinker Materials - Florin Rd./Besser Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure name Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberMIX 12B PRECAST
The truck number from where the sample was collected The batch plant ticket number from where the sample was collected2-17996
Concrete batch plant The fabricator/manufacturer designation for the sample
A detailed description of where the material sample was collectedFlorin Rd./Besser South plant - 120" RCP Jack Pipe production Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2026-05-11-66
DIME Test ID: 2026-05-11-66-2
Testing Lab: Rinker Materials
Test Method: CTM TEMP1-16: Test Method for Monitoring Precast Concrete Curing Temperature (Curing temperature)
Test Release Date: 2026-07-14

Test Results


Input Type: Calculated
Tester's full name: Wilfredo Bucaneg
Date of test: 05/11/2026
Precast Maximum Curing Temperature: 117.2 °F
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/14/2026