Summary for Test 2026-06-27-17-2
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 1000607 DEA: 081K6904 EFIS: 0819000090 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-5.7/11.8 |
| Award Date | 01/09/2025 |
| Closeout Date | Not set |
| Work Description | ROCK EXCAVATION, HMA (TYPE A), RHMA-G, AND CABLE NET DRAPERY SYSTEM. |
| Location Description | RIVERSIDE COUNTY IN AND NEAR LAKE ELSINORE FROM MONTE VISTA STREET TO GRAND AVENUE |
| QA Service Level | 1 (Verified on 01/13/2025) |
Sample Information
| Sample Taken Date | 06/27/2026 | Sample Unique Key | 17 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/30/2026 |
| Sample type | Quality Assurance | A brief description of the sample | 3/4" HMA-A |
| The quantity of what the sample constitutes | 197.68 | From where was the sample collected | Manufacturer |
| First name of sampler or witnessed by | Suliman | Last name of sampler or witnessed by | Mahmoud |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Valero Lake Elsinore | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 0.0 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2026-06-27-17
DIME Test ID: 2026-06-27-17-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-07-07
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Sutham Chansawangpuvana
Date of test: 07/03/2026
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2140.9 g
Mass Loss: 121.2 g
Correction Factor (Percent by mass of HMA Specimen): 0.74 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.07 %
Test Temperature: 538 C
Corrected Asphalt Binder Content: 5.60 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/7/2026 ✔
