Summary for Test 2026-06-19-13-2
Test performed: CTM 342-August 2012Project Information
| Project Identifiers | Project ID: 1002183 DEA: 101T3004 EFIS: 1024000229 |
|---|---|
| DIST-CO-RTE-PM | 10-CAL-var-var |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Not set |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 05/11/2026) |
Sample Information
| Sample Taken Date | 06/19/2026 | Sample Unique Key | 13 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 06/19/2026 | Sample type | Acceptance |
| A brief description of the sample | Skid Testing Request | The quantity of what the sample constitutes | Multiple Lanes |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Graham |
| Last name of sampler or witnessed by | Joseph | Title of sampler | |
| Telephone number of sampler | Laboratory sample identification | ||
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | Myers and Sons Construction | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | ||
| Bid Item | Not set |
Material Information
| Material Type | Roadway/Bridge Surface | Pavement Surface Type | Polyester Concrete |
|---|---|---|---|
| Type of Traffic Control Provided | Stationary Lane Closure | DIST-CO-RTE | 10-SJ-88 |
| Direction of Travel | Post Mile | 8.91 | |
| Lanes to be Tested | Station |
Test Details
DIME Sample ID: 2026-06-19-13
DIME Test ID: 2026-06-19-13-2
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-07-02
Test Results
Pavement or Bridge Deck?: Bridge Deck
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 06/30/2026
Air Temperature: 82
Tire Pressure: 25
Equipment PST #: 10007/1008
Is Calibration within ± values: Yes
Weather: WARM
Direction/Lane #: EB: Eastbound Direction of Travel
Edge used to measure reference distance: BEGIN BRIDGE
Edge used to measure position: LEFT OF WALL
Reference Distance 1: 50
Reference Distance 2: 53
Reference Distance 3: 56
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Position for Stationing 1: 2
Position for Stationing 2: 2
Position for Stationing 3: 2
Percent Grade for 1st Stationing: -1.0
Percent Grade for 2nd Stationing: -1.0
Percent Grade for 3rd Stationing: -1.0
Corrected Coefficients of Friction for Stationing 1: 0.48
Corrected Coefficients of Friction for Stationing 2: 0.48
Corrected Coefficients of Friction for Stationing 3: 0.48
Average Coefficient of Friction: 0.48
General comments (publicly viewable) (Max 1000 characters): LITTLE JOHNS CREEK BRIDGE
Test was verified on 7/2/2026 ✔
