Summary for Test 2026-06-11-32-3
Test performed: ASTM D5329-20Project Information
| Project Identifiers | Project ID: 1000014 DEA: 010H1504 EFIS: 0117000116 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-162-R0.0/25.7 |
| Award Date | 03/26/2024 |
| Closeout Date | Not set |
| Work Description | HMA, RHMA, AND GEOSYNTHETIC PAVEMENT INTERLAYER. |
| Location Description | MENDOCINO COUNTY NEAR LONGVALE FROM ROUTE 101 TO 1.1 MILES SOUTH OF POONKINNEY ROAD NEAR COVELO |
| QA Service Level | 1 (Verified on 01/10/2024) |
Sample Information
| Sample Taken Date | 06/11/2026 | Sample Unique Key | 32 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/18/2026 |
| Sample type | Quality Assurance | A brief description of the sample | 1 can PG 64-16 Rubber binder |
| The quantity of what the sample constitutes | 1 can binder | From where was the sample collected | Source |
| First name of sampler or witnessed by | Felipe | Last name of sampler or witnessed by | Damian |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | 26-118 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | Granite Ukiah | Transportation Laboratory (TL) Number | 900197 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | 900197 | Structure unique identifier | |
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | 3 |
| Sublot number | 7 | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2026-06-11-32
DIME Test ID: 2026-06-11-32-3
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D5329-20: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2026-06-30
Test Results
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 06/30/2026
Temperature: 25 C
Ball Penetration (P1): 3 mm
Final Dial reading (F1): 65 mm
Ball Penetration (P2): 2 mm
Final Dial reading (F2): 63 mm
Ball Penetration (P3): 5 mm
Final Dial reading (F3): 67 mm
Resilience 1: 38 %
Resilience 2: 39 %
Resilience 3: 38 %
Average Resilience: 38 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters): Resilience
Test was verified on 6/30/2026 ✔
