Summary for Test 2026-06-10-50-1

Test performed: ASTM D217-21

Project Information

Project IdentifiersProject ID: 1002310
DEA: 010P6404
EFIS: 0125000053
DIST-CO-RTE-PM01-HUM-101-R131.7/134.6
Award Date02/17/2026
Closeout Date10/22/2026
Work DescriptionBoyes Creek Viaduct
Location DescriptionNot set
QA Service Level1 (Verified on 06/15/2026)

Sample Information

Sample Taken Date06/10/2026 Sample Unique Key50
Date that the sample was received by the laboratory/organization performing the testing06/18/2026 Sample typeQuality Assurance
A brief description of the samplepg 64-16 The quantity of what the sample constitutes4 qts
From where was the sample collectedManufacturer First name of sampler or witnessed byjason
Last name of sampler or witnessed byhuett Title of sampler
Telephone number of sampler Laboratory sample identification26117
Linked DIME Sample ID The fabricator/manufacturer/facility nameMercer Fraser Boyd Road
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Rubber Binder Asphalt modifier supplier
Performance GradePG 64-16 Lot number
Sublot number Asphalt Rubber Binder Mix Number

Test Details

DIME Sample ID: 2026-06-10-50
DIME Test ID: 2026-06-10-50-1
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: ASTM D217-21: Standard Test Methods for Cone Penetration of Lubricating Grease (Cone Penetration)
Test Release Date: 2026-06-30

Test Results


Determination: Unworked Penetration
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 06/30/2026
Unworked Penetration, Test 1: 37 0.1 mm
Unworked Penetration, Test 2: 35 0.1 mm
Unworked Penetration, Test 3: 36 0.1 mm
Unworked Penetration: 36 0.1 mm
General comments (publicly viewable) (Max 1000 characters): CONE PENETRATION

Test was verified on 6/30/2026 ✔