Summary for Test 2026-05-29-57-6

Test performed: AASHTO T240-23

Project Information

Project IdentifiersProject ID: 215734
DEA: 024H0104
EFIS: 0218000068
DIST-CO-RTE-PM02-PLU-70-78.3/90.3
Award Date01/29/2025
Closeout DateNot set
Work DescriptionREPLACE AC SURFACING, PLACE HMA AND THERMOPLASTIC TRAFFIC STRIPING.
Location DescriptionPLUMAS COUNTY NEAR PORTOLA FROM 0.4 MILE WEST OF BIG GRIZZLY CREEK BRIDGE TO 0.8 MILE WEST OF SUMMIT SCHOOL DRIVE
QA Service Level1 (Verified on 07/08/2021)

Sample Information

Sample Taken Date05/29/2026 Sample Unique Key57
Date that the sample was received by the laboratory/organization performing the testing06/16/2026 Sample typeAcceptance
A brief description of the sample2 cans of binder The quantity of what the sample constitutes2, 1 quart cans of binder
From where was the sample collectedSource First name of sampler or witnessed byE
Last name of sampler or witnessed byChavez Title of samplerMaterials Tester
Telephone number of sampler Laboratory sample identification080217
Linked DIME Sample ID The fabricator/manufacturer/facility nameHat Creek Construction, Ward Lake Plant, Litchfield, CA
Transportation Laboratory (TL) Number036633 Inspector Lot Number from the Transportation Laboratory (TL) Form036633
Structure unique identifier Structure name
Bid ItemNot set

Material Information

Material TypeAsphalt Binder Performance GradePG 58-34
ModifiedNo Lot number
Sublot number Tank number
Time of sample HMA SupplierHat Creek- Yard Lake
Certified Asphalt SupplierWestern Emulsions - White City Emulsion Plant - White City OR MultigradeNo
Multigrade Type Asphalt Binder Mix Number
HMA TypeNot set HMA Supplier Mix ID NumberNot set

Test Details

DIME Sample ID: 2026-05-29-57
DIME Test ID: 2026-05-29-57-6
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-06-30

Test Results


Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: No
Input Type: Measured
Tester's full name: Erik Svensson
Date of test: 06/30/2026
Any material loss from containers during heating process/testing?: no data
Mass of container #1 before test (m1i): 211.932 grams
Mass of container #2 before test (m2i): 212.217 grams
Mass of container #1 after test (m1f): 211.761 grams
Mass of container #2 after test (m2f): 212.045 grams
Mass of empty container #1: 176.731 grams
Mass of empty container #2: 177.216 grams
Average mass change: -0.489 percent
General comments (publicly viewable) (Max 1000 characters): MASS CHANGE

Test was verified on 6/30/2026 ✔