Summary for Test 2026-06-26-19-4
Test performed: ASTM C231-17aProject Information
| Project Identifiers | Project ID: 1002030 DEA: 020J7604 EFIS: 0219000157 |
|---|---|
| DIST-CO-RTE-PM | 02-TRI-3-67.7/T85.06 |
| Award Date | 02/18/2026 |
| Closeout Date | Not set |
| Work Description | Tangle Blue CAPM |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 04/06/2026) |
Sample Information
| Sample Taken Date | 06/26/2026 | Sample Unique Key | 19 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/26/2026 |
| Sample type | Quality Control | A brief description of the sample | 4x8 concrete cylinders |
| The quantity of what the sample constitutes | 6.25 cu/yd | From where was the sample collected | Fabricator |
| First name of sampler or witnessed by | Tyler | Last name of sampler or witnessed by | Perry |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Shasta Ready Mix | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | CT850SLA50 |
|---|---|---|---|
| The truck number from where the sample was collected | The batch plant ticket number from where the sample was collected | 116075 | |
| Concrete batch plant | The fabricator/manufacturer designation for the sample | ||
| A detailed description of where the material sample was collected | Back of Truck | Where the material sample would have been placed if not sampled | |
| From Lot No. | Bag Lot No. |
Test Details
DIME Sample ID: 2026-06-26-19
DIME Test ID: 2026-06-26-19-4
Testing Lab: Precast Unlimited Inc.
Test Method: ASTM C231-17a: Standard Test Method for Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-06-26
Test Results
Is wet sieving required?: No
Input Type: Calculated
Tester's full name: Zachary Crane
Date of test: 06/26/2026
Air content: 7.2 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/26/2026 ✔