Summary for Test 2026-05-06-87-1

Test performed: CTM 518-June 2010

Project Information

Project IdentifiersProject ID: 1001391
DEA: 051S4904
EFIS: 0525000044
DIST-CO-RTE-PM05-SB-1-10.14
Award DateNot set
Closeout DateNot set
Work DescriptionExcavating and Grading, repair/stabilize embankment, Soldier Pile Wall construction, Paving, Providing temporary traffic control
Location DescriptionNot set
QA Service Level1 (Verified on 07/15/2025)

Sample Information

Sample Taken Date05/06/2026 Sample Unique Key87
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/07/2026
Sample typeQuality Control A brief description of the sample6x12 Cylinders
The quantity of what the sample constitutes7 From where was the sample collectedJob Site
First name of sampler or witnessed byRonnie Last name of sampler or witnessed byRoberts
Title of samplerField Technician Telephone number of sampler
Laboratory sample identification590GN3010 Set 1 Linked DIME Sample ID
The fabricator/manufacturer/facility nameCalPortland Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier
Structure nameCoping Wall, Truck #6606 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design number590GN3010
The truck number from where the sample was collectedLoad 1 The batch plant ticket number from where the sample was collected2185648
Concrete batch plantCalPortland The fabricator/manufacturer designation for the sampleSet 1
A detailed description of where the material sample was collectedCoping Wall, Truck #6606 Where the material sample would have been placed if not sampled
From Lot No.1 Bag Lot No.1

Test Details

DIME Sample ID: 2026-05-06-87
DIME Test ID: 2026-05-06-87-1
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2026-06-19

Test Results


Input Type: Calculated
Tester's full name: Ronnie Roberts
Date of test: 05/06/2026
Unit weight of the concrete: 143.8 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 6/19/2026