Summary for Test 2026-06-11-28-2
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 1000481 DEA: 081C07U4 EFIS: 0824000168 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-74-27.5/34.3 |
| Award Date | 08/11/2025 |
| Closeout Date | Not set |
| Work Description | RUBBERIZED HMA, FIBER OPTIC CABLE SYSTEMS, AND COLD PLANE AC PAVEMENT. |
| Location Description | RIVERSIDE COUNTY AT AND NEAR ROMOLAND AND HOMELAND FROM BONNIE DRIVE TO WINCHESTER ROAD |
| QA Service Level | 1 (Verified on 09/02/2024) |
Sample Information
| Sample Taken Date | 06/11/2026 | Sample Unique Key | 28 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/16/2026 |
| Sample type | Verification | A brief description of the sample | Asphalt Binder Sample |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | Dylan | Last name of sampler or witnessed by | Nault |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | Martin Mariett(CCA) Lake Elsinore | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 64-16 |
|---|---|---|---|
| Modified | Lot number | ||
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | ||
| Certified Asphalt Supplier | Valero Wilmington Refinery - Wilmington CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2026-06-11-28
DIME Test ID: 2026-06-11-28-2
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-07-01
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 06/17/2026
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 206.051 grams
Mass of container #2 before test (m2i): 202.602 grams
Mass of container #1 after test (m1f): 205.891 grams
Mass of container #2 after test (m2f): 202.438 grams
Mass of empty container #1: 170.915 grams
Mass of empty container #2: 167.461 grams
Mass correction factor: 0.006
Average mass change: -0.455 percent
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/1/2026 ✔
