Summary for Test 2026-06-02-88-3
Test performed: ASTM D5329-20Project Information
| Project Identifiers | Project ID: 214649 DEA: 07316004 EFIS: 0715000194 |
|---|---|
| DIST-CO-RTE-PM | 07-LA-14-60.70 |
| Award Date | 02/07/2023 |
| Closeout Date | Not set |
| Work Description | REHABILITATION FOR THE ON/OFF RAMPS AND ADJACENT SHOULDERS. UPGRADING METAL BEAM GUARDRAILS, AC DIKES, SIGN PANELS, CURB RAMPS, TRAFFIC LOOPS DETECTORS, AND SOME OTHER HIGHWAY APPURTENANCES. |
| Location Description | ROUTE 14 FROM PALMDALE BLVD TO KERN COUNTRY LINE. |
| QA Service Level | 1 (Verified on 01/29/2020) |
Sample Information
| Sample Taken Date | 06/02/2026 | Sample Unique Key | 88 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/04/2026 |
| Sample type | Verification | A brief description of the sample | Asphalt Rubber Binder |
| The quantity of what the sample constitutes | 1can | From where was the sample collected | Source |
| First name of sampler or witnessed by | RAMY | Last name of sampler or witnessed by | BESHARA |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | VALCAN-SUN VALLEY | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Asphalt Rubber Binder | Asphalt modifier supplier | |
|---|---|---|---|
| Performance Grade | PG 64-16 | Lot number | |
| Sublot number | Asphalt Rubber Binder Mix Number |
Test Details
DIME Sample ID: 2026-06-02-88
DIME Test ID: 2026-06-02-88-3
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: ASTM D5329-20: Standard Test Methods for Sealants and Fillers, Hot-Applied, for Joints and Cracks in Asphalt Pavements and Portland Cement Concrete Pavements (Asphalt Pavement)
Test Release Date: 2026-07-02
Test Results
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 06/15/2026
Temperature: 25 C
Ball Penetration (P1): 5 mm
Final Dial reading (F1): 67 mm
Ball Penetration (P2): 4 mm
Final Dial reading (F2): 66 mm
Ball Penetration (P3): 6 mm
Final Dial reading (F3): 68 mm
Resilience 1: 38 %
Resilience 2: 38 %
Resilience 3: 38 %
Average Resilience: 38 %
Minutes Reaction: no data
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 7/2/2026 ✔
