Summary for Test 2025-08-19-131-3
Test performed: CTM 504-June 2010Project Information
| Project Identifiers | Project ID: 1001391 DEA: 051S4904 EFIS: 0525000044 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-1-10.14 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Excavating and Grading, repair/stabilize embankment, Soldier Pile Wall construction, Paving, Providing temporary traffic control |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 07/15/2025) |
Sample Information
| Sample Taken Date | 08/19/2025 | Sample Unique Key | 131 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 08/20/2025 | Sample type | Quality Control |
| A brief description of the sample | 4x8 Cylinders | The quantity of what the sample constitutes | 8 |
| From where was the sample collected | Job Site | First name of sampler or witnessed by | Brenda |
| Last name of sampler or witnessed by | Amaya | Title of sampler | Field Technician |
| Telephone number of sampler | Laboratory sample identification | 710GN1010 Set 1 | |
| Linked DIME Sample ID | The fabricator/manufacturer/facility name | CalPortland | |
| Transportation Laboratory (TL) Number | Inspector Lot Number from the Transportation Laboratory (TL) Form | ||
| Structure unique identifier | Structure name | CIDH Pile 15 | |
| Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 710GN1010 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | CalPortland | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | CIDH Pile 15 | Where the material sample would have been placed if not sampled | |
| From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2025-08-19-131
DIME Test ID: 2025-08-19-131-3
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-06-19
Test Results
Input Type: Calculated
Tester's full name: Brenda Amaya
Date of test: 08/19/2025
Air Content: 1.7 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/19/2026 ✔