Summary for Test 2025-08-18-123-2
Test performed: CTM 518-June 2010Project Information
| Project Identifiers | Project ID: 1001391 DEA: 051S4904 EFIS: 0525000044 |
|---|---|
| DIST-CO-RTE-PM | 05-SB-1-10.14 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | Excavating and Grading, repair/stabilize embankment, Soldier Pile Wall construction, Paving, Providing temporary traffic control |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 07/15/2025) |
Sample Information
| Sample Taken Date | 08/18/2025 | Sample Unique Key | 123 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 08/19/2025 |
| Sample type | Quality Control | A brief description of the sample | 4x8 Cylinders |
| The quantity of what the sample constitutes | 8 | From where was the sample collected | Job Site |
| First name of sampler or witnessed by | Brenda | Last name of sampler or witnessed by | Amaya |
| Title of sampler | Field Technician | Telephone number of sampler | |
| Laboratory sample identification | 710GN1010 Set 1 | Linked DIME Sample ID | |
| The fabricator/manufacturer/facility name | CalPortland | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | CIDH Pile 12 | Bid Item | Not set |
Material Information
| Material Type | Concrete | The concrete mix design number | 710GN1010 |
|---|---|---|---|
| The truck number from where the sample was collected | Load 1 | The batch plant ticket number from where the sample was collected | 0 |
| Concrete batch plant | CalPortland | The fabricator/manufacturer designation for the sample | Set 1 |
| A detailed description of where the material sample was collected | CIDH Pile 12 | Where the material sample would have been placed if not sampled | |
| From Lot No. | 1 | Bag Lot No. | 1 |
Test Details
DIME Sample ID: 2025-08-18-123
DIME Test ID: 2025-08-18-123-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 518-June 2010: Method of Test for Unit Weight of Fresh Concrete
Test Release Date: 2026-06-19
Test Results
Input Type: Calculated
Tester's full name: Brenda Amaya
Date of test: 08/18/2025
Unit weight of the concrete: 144.2 lb/ft^3
Cement content: 0 lb/yd^3
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/19/2026 ✔