Summary for Test 2026-06-05-32-1
Test performed: AASHTO T308-25Project Information
| Project Identifiers | Project ID: 1001960 DEA: 081J65U4 EFIS: 0824000091 |
|---|---|
| DIST-CO-RTE-PM | 08-RIV-10-0.0/R8.2 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | HMA, RHMA, JPCP, JPCP(RSC), and individual slab replacement (RSC). |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 03/23/2026) |
Sample Information
| Sample Taken Date | 06/05/2026 | Sample Unique Key | 32 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 06/09/2026 |
| Sample type | Acceptance | A brief description of the sample | 3/4" HMA TYPE A |
| The quantity of what the sample constitutes | 155.09 TONS OUT | From where was the sample collected | Source |
| First name of sampler or witnessed by | Idris | Last name of sampler or witnessed by | Najjar |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | All American Asphalt Corona | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Hot Mix Asphalt | HMA Type | Type A HMA |
|---|---|---|---|
| HMA Grading | 3/4 inch | Lot number | |
| Sublot number | HMA Mix Number | ||
| Binder content (%) | 4.7 | Virgin binder PG | |
| Design binder PG | Binder Supplier | ||
| RAP content (%) | Not set | WMA Additives | |
| Antistrip type |
Test Details
DIME Sample ID: 2026-06-05-32
DIME Test ID: 2026-06-05-32-1
Testing Lab: CT D08 - Fontana Southern Regional Laboratory
Test Method: AASHTO T308-25: Standard Method of Test for Determining the Asphalt Binder Content of Hot Mix Asphalt (HMA) by the Ignition Method (Method A) (Asphalt Binder Content)
Test Release Date: 2026-06-12
Test Results
What temperature unit is used?: Celsius
Input Type: Calculated
Tester's full name: Ayman Nabulsi
Date of test: 06/12/2026
Test procedure used?: Method A
Mass of HMA Sample prior to ignition: 2168.7 g
Mass Loss: 107.6 g
Correction Factor (Percent by mass of HMA Specimen): 0.36 %
Moisture Content: 0.00 %
Temperature Compensation Factor: 0.11 %
Test Temperature: 537 C
Corrected Asphalt Binder Content: 4.49 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/12/2026 ✔
