Summary for Test 2026-05-19-74-2
Test performed: CTM 217-June 2011Project Information
| Project Identifiers | Project ID: 1001361 DEA: 120M9704 EFIS: 1213000099 |
|---|---|
| DIST-CO-RTE-PM | 12-ORA-57-11.5/12.5 |
| Award Date | 09/25/2025 |
| Closeout Date | Not set |
| Work Description | CONST BRIDGES, RET WALLS, JPCP, HMA, CONC BARRIERS AND ELECT SYSTEMS. |
| Location Description | ORANGE COUNTY IN ORANGE AND ANAHEIM FROM 0.2 MILE SOUTH OF ORANGEWOOD AVENUE UNDERCROSSING TO KATELLA AVENUE UNDERCROSSING |
| QA Service Level | 1 (Verified on 07/28/2025) |
Sample Information
| Sample Taken Date | 05/19/2026 | Sample Unique Key | 74 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 05/19/2026 |
| Sample type | Quality Control | A brief description of the sample | 1x4 concrete aggregates |
| The quantity of what the sample constitutes | 1 per batch | From where was the sample collected | Supplier |
| First name of sampler or witnessed by | Lee | Last name of sampler or witnessed by | Hernandez |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | CEMEX - ORANGE | Transportation Laboratory (TL) Number | |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | Bid Item | Not set |
Material Information
| Material Type | Aggregate | Source Identification (SMARA, name of Pit or Job Site) | 91-36-0019, 91-36-0040 |
|---|---|---|---|
| The fabricator's/manufacturer's product name for the sample | The fabricator/manufacturer designation for the sample | ||
| The plant number | A detailed description of where the material sample was collected | belt cut or stockpile | |
| Where the material sample would have been placed if not sampled | Primary Aggregate Nominal Size | 1 inch | |
| The concrete mix design number | 1633629 | Lot number | |
| Sublot number | Aggregate Mix Number |
Test Details
DIME Sample ID: 2026-05-19-74
DIME Test ID: 2026-05-19-74-2
Testing Lab: Sequoia Consultants
Test Method: CTM 217-June 2011: Method of Test for Sand Equivalent
Test Release Date: 2026-06-11
Test Results
Number of tests: 2
Input Type: Calculated
Tester's full name: Ryan Montanez
Date of test: 05/21/2026
Temperature correction: 0
Temperature of solution: 77
Clay reading (test 1): 5.2
Sand reading (test 1): 4.3
Clay reading (test 2): 5.3
Sand reading (test 2): 4.3
Sand equivalent (test 1): 83
Sand equivalent (test 2): 82
Sand equivalent before temperature correction: 83
Sand equivalent after temperature correction: 83
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 6/11/2026 ✔
