Summary for Test 2026-05-29-41-2
Test performed: AASHTO T240-23Project Information
| Project Identifiers | Project ID: 995520 DEA: 041Y7004 EFIS: 0423000016 |
|---|---|
| DIST-CO-RTE-PM | 04-CC,SOL-80-13.8/14.1,0.0/0.4 |
| Award Date | Not set |
| Closeout Date | Not set |
| Work Description | AL ZAMPA BRIDGE DECK REHABILITATION REPLACE TOP COURSE |
| Location Description | CONTRA COSTA AND SOLANO COUNTIES AT CROCKETT AND IN VALLEJO FROM UNION PACIFIC RAILROAD OVERHEAD TO 0.8 MILE SOUTH OF ROUTE 80/29 SEPARATION |
| QA Service Level | 1 (Verified on 12/06/2023) |
Sample Information
| Sample Taken Date | 05/29/2026 | Sample Unique Key | 41 |
|---|---|---|---|
| Will the laboratory/organization for which you are a member perform testing on this material sample? | No | Date that the sample was received by the laboratory/organization performing the testing | 06/05/2026 |
| Sample type | Quality Assurance | A brief description of the sample | PG76-22M from PNW |
| The quantity of what the sample constitutes | 3 binder cans | From where was the sample collected | Source |
| First name of sampler or witnessed by | Venu | Last name of sampler or witnessed by | Gopal |
| Title of sampler | Telephone number of sampler | ||
| Laboratory sample identification | Linked DIME Sample ID | ||
| The fabricator/manufacturer/facility name | pacifc northwest | Transportation Laboratory (TL) Number | 60326-1 |
| Inspector Lot Number from the Transportation Laboratory (TL) Form | Structure unique identifier | ||
| Structure name | AL Zampa Bridge | Bid Item | Not set |
Material Information
| Material Type | Asphalt Binder | Performance Grade | PG 76-22 M |
|---|---|---|---|
| Modified | Yes | Lot number | |
| Sublot number | Tank number | ||
| Time of sample | HMA Supplier | Martin Murrieta Berkley Plant | |
| Certified Asphalt Supplier | Pacific Northwest Oil - Stockton CA | Multigrade | No |
| Multigrade Type | Asphalt Binder Mix Number | ||
| HMA Type | Not set | HMA Supplier Mix ID Number | Not set |
Test Details
DIME Sample ID: 2026-05-29-41
DIME Test ID: 2026-05-29-41-2
Testing Lab: CT HQ - Sacramento Asphalt Binder Laboratory
Test Method: AASHTO T240-23: Standard Method of Test for Effect of Heat and Air on a Moving Film of Asphalt Binder (Rolling Thin-Film Oven Test)
Test Release Date: 2026-06-11
Test Results
Is mass change based on one or two containers?: Two
Is mass change correction factor needed?: Yes
Input Type: Measured
Tester's full name: Angelito Villegas
Date of test: 06/10/2026
Any material loss from containers during heating process/testing?: No
Mass of container #1 before test (m1i): 203.199 grams
Mass of container #2 before test (m2i): 207.017 grams
Mass of container #1 after test (m1f): 202.413 grams
Mass of container #2 after test (m2f): 206.245 grams
Mass of empty container #1: 168.206 grams
Mass of empty container #2: 171.930 grams
Mass correction factor: 0.006
Average mass change: -2.217 percent
General comments (publicly viewable) (Max 1000 characters): MASS CHANGE
Test was verified on 6/11/2026 ✔
