Summary for Test 2018-03-28-13-4

Test performed: SMTL BILST-06

Project Information

Project IdentifiersProject ID: 212618
DEA: 044G0564
EFIS: 0417000154
DIST-CO-RTE-PM04-ALA-680-M2.4/M12.4
Award Date11/16/2017
Closeout Date12/08/2022
Work DescriptionROADWAY REHAB, BRIDGE REPLACEMENT, RET. WALLS, TOLL SYSTEMS
Location DescriptionFREMONT AND AT SUNOL FROM MISSION BOULEVARD SEPARATION TO KOOPMAN ROAD UNDERCROSSING
QA Service Level1 (Verified on 10/16/2017)

Sample Information

Sample Taken Date03/28/2018 Sample Unique Key13
Date that the sample was received by the laboratory/organization performing the testing04/03/2018 Sample typeQuality Assurance
A brief description of the sampleBearing Pad The quantity of what the sample constitutes2
From where was the sample collectedManufacturer First name of sampler or witnessed byKayla
Last name of sampler or witnessed byWallace Title of samplerUnknown
Telephone number of samplerUnknown Laboratory sample identificationUnknown
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameDynamic Rubber
Transportation Laboratory (TL) NumberNA Inspector Lot Number from the Transportation Laboratory (TL) FormNA
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeSMTL TM1 - Elastomeric Bearing Pad Mfg. Lot Number(s)14592
Material/Compound/Elastomer IDNA Samples RepresentingNA
Description (size)2.88in x 12in x 16in 1.15in x 10in x 12in CommentsUnknown
Description (Number of Shims)5 Type of Bearing PadSteel
Description (Thickness of Shims)14 gage Manufacturer(s)Dynamic Rubber
Batch NumberNA

Test Details

DIME Sample ID: 2018-03-28-13
DIME Test ID: 2018-03-28-13-4
Testing Lab: CT HQ - Sacramento Chemistry Laboratory
Test Method: SMTL BILST-06: (Neoprene Verification) Bilstein Test
Test Release Date: 2018-04-10

Test Results


Input Type: Measured
Tester's full name: Lisa Dobeck
Date of test: 04/03/2018
Result: Pass
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 4/3/2018 ✔