Summary for Test 2026-05-11-15-1

Test performed: CTM 342-August 2012

Project Information

Project IdentifiersProject ID: 1000259
DEA: 050N74V4
EFIS: 0522000043
DIST-CO-RTE-PM05-SB-101-9.2/9.7
Award Date02/08/2024
Closeout DateNot set
Work DescriptionNot set
Location DescriptionFOR CONSTRUCTION ON STATE HIGHWAY IN SANTA BARBARA COUNTY AT MONTECITO FROM 0.2 MILE NORTH OF SHEFFIELD DRIVE UNDERCROSSING TO 0.3 MILE SOUTH OF SAN YSIDRO ROAD OVERCROSSING
QA Service Level1 (Verified on 04/15/2024)

Sample Information

Sample Taken Date05/11/2026 Sample Unique Key15
Date that the sample was received by the laboratory/organization performing the testing05/11/2026 Sample typeAcceptance
A brief description of the sampleSKID TESTING REQUEST The quantity of what the sample constitutesBridge decks, CRCP multiple
From where was the sample collectedJob Site First name of sampler or witnessed byJosh
Last name of sampler or witnessed byMadrigal Title of sampler
Telephone number of sampler Laboratory sample identification
Linked DIME Sample ID The fabricator/manufacturer/facility nameCemex
Transportation Laboratory (TL) Number Inspector Lot Number from the Transportation Laboratory (TL) Form
Structure unique identifier51-0348, 51-0349, 51-0350 AND ADJACENT APPROACH SLABS, CRCP PAVEMENT Structure nameROMERO CREEK BRIDGE, SAN YSIDRO CREEK BRIDGE, OAK CREEK BRIDGE AND ADJACENT CRCP PAVEMENTS
Bid ItemNot set

Material Information

Material TypeRoadway/Bridge Surface Pavement Surface TypePCC (Portland Cement Concrete)
Type of Traffic Control ProvidedBehind K-Rail/Barrier DIST-CO-RTE05-SB-101
Direction of TravelSouth Post Mile
Lanes to be TestedOn Ramp,Off Ramp,Lane #2,Lane #3 Station9.2 to 11.1

Test Details

DIME Sample ID: 2026-05-11-15
DIME Test ID: 2026-05-11-15-1
Testing Lab: CT HQ - FFS - Skid Testing
Test Method: CTM 342-August 2012: Method of Test for Surface Skid Resistance with the California Portable Skid Tester (Skid)
Test Release Date: 2026-06-09

Test Results


Pavement or Bridge Deck?: Pavement
Input Type: Measured
Tester's full name: HARISH THAKUR
Date of test: 06/08/2026
Air Temperature: 60
Tire Pressure: 25
Equipment PST #: 1000-7/1000-8
Is Calibration within ± values: Yes
Weather: COOL
Direction/Lane #: SB: Southbound Direction of Travel
Edge used to measure reference distance: BEGIN PROJECT
Edge used to measure position: RIGHT OF BARRIER
Project Stationing 1: 100+00
Project Stationing 2: 125+00
Project Stationing 3: 150+00
Project Stationing 4: 175+00 ft
Project Stationing 5: 200+00 ft
Direction and Lane # for Stationing 1: no data
Direction and Lane # for Stationing 2: no data
Direction and Lane # for Stationing 3: no data
Direction and Lane # for Stationing 4: no data
Direction and Lane # for Stationing 5: no data
Position for Stationing 1: 14
Position for Stationing 2: 14
Position for Stationing 3: 14
Position for Stationing 4: 14 ft
Position for Stationing 5: 14 ft
Percent Grade for 1st Stationing: -1.0
Percent Grade for 2nd Stationing: -1.0
Percent Grade for 3rd Stationing: -1.0
Percent Grade for 4th Stationing: -1.0 %
Percent Grade for 5th Stationing: -1.0 %
Corrected Coefficients of Friction for Stationing 1: 0.34
Corrected Coefficients of Friction for Stationing 2: 0.35
Corrected Coefficients of Friction for Stationing 3: 0.36
Corrected Coefficients of Friction for Stationing 4: 0.36
Corrected Coefficients of Friction for Stationing 5: 0.33
Average Coefficient of Friction: 0.35
General comments (publicly viewable) (Max 1000 characters): EXIT #94 OFF RAMP. ENTIRE OFF RAMP VISUALLY INSPECTED, ALL LOOKED UNIFORMED

Test was verified on 6/9/2026 ✔