Summary for Test 2018-02-20-25-1

Test performed: AASHTO T30-15

Project Information

Project IdentifiersProject ID: 212852
DEA: 010H7604
DIST-CO-RTE-PM01-MEN-101-33.0/42.0
Award Date10/10/2017
Closeout Date08/06/2020
Work DescriptionFire Damage Repairs: Roadway Repair, Drainage/Slope Repair, Erosion Control, Fencing, MBGR and Sign Replacement, Hazard Tree and Debris Removal.
Location DescriptionNot set
QA Service Level1 (Verified on 01/26/2018)

Sample Information

Sample Taken Date02/20/2018 Sample Unique Key25
Date that the sample was received by the laboratory/organization performing the testing02/22/2018 Sample typeQuality Control
A brief description of the sampleRAP ignition 1 The quantity of what the sample constitutesrenewal
From where was the sample collectedManufacturer First name of sampler or witnessed bya
Last name of sampler or witnessed bye Title of samplerUnknown
Telephone number of samplerUnknown Laboratory sample identification61894
Linked DIME Sample IDUnknown The fabricator/manufacturer/facility nameGranite Ukiah
Transportation Laboratory (TL) NumberUnknown Inspector Lot Number from the Transportation Laboratory (TL) FormUnknown
Structure unique identifierNot set Structure nameNot set
Bid ItemNot set

Material Information

Material TypeReclaimed Asphalt Pavement RAP Sourcegranite ukiah
Aggregate SizeUnknown Aggregate SourceUnknown
RAP Stockpile Stockpile Size (tons)Unknown
Reclaimed Asphalt Pavement Mix NumberNot set HMA PayNo

Test Details

DIME Sample ID: 2018-02-20-25
DIME Test ID: 2018-02-20-25-1
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2018-04-06

Test Results


Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 03/30/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 99.5 %
Cumulative percent passing the 1/4 in. sieve: 99.5 %
Cumulative percent passing the #4 sieve: 72.6 %
Cumulative percent passing the #8 sieve: 48.2 %
Cumulative percent passing the #16 sieve: 32.2 %
Cumulative percent passing the #30 sieve: 22.5 %
Cumulative percent passing the #50 sieve: 16.1 %
Cumulative percent passing the #100 sieve: 11.9 %
Cumulative percent passing the #200 sieve: 8.8 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 3/30/2018 ✔