Summary for Test 2018-02-20-17-4
Test performed: AASHTO T30-15Project Information
Project Identifiers | Project ID: 212852 DEA: 010H7604 |
---|---|
DIST-CO-RTE-PM | 01-MEN-101-33.0/42.0 |
Award Date | 10/10/2017 |
Closeout Date | 08/06/2020 |
Work Description | Fire Damage Repairs: Roadway Repair, Drainage/Slope Repair, Erosion Control, Fencing, MBGR and Sign Replacement, Hazard Tree and Debris Removal. |
Location Description | Not set |
QA Service Level | 1 (Verified on 01/26/2018) |
Sample Information
Sample Taken Date | 02/20/2018 | Sample Unique Key | 17 |
---|---|---|---|
Will the laboratory/organization for which you are a member perform testing on this material sample? | Yes | Date that the sample was received by the laboratory/organization performing the testing | 02/22/2018 |
Sample type | Quality Control | A brief description of the sample | RAP - Chem 1 |
The quantity of what the sample constitutes | renewal | From where was the sample collected | Manufacturer |
First name of sampler or witnessed by | a | Last name of sampler or witnessed by | e |
Title of sampler | Unknown | Telephone number of sampler | Unknown |
Laboratory sample identification | 61894 | Linked DIME Sample ID | Unknown |
The fabricator/manufacturer/facility name | Granite Ukiah | Transportation Laboratory (TL) Number | Unknown |
Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown | Structure unique identifier | Not set |
Structure name | Not set |
Material Information
Material Type | Reclaimed Asphalt Pavement | RAP Source | granite ukiah |
---|---|---|---|
Aggregate Size | Unknown | Aggregate Source | Unknown |
RAP Stockpile | Stockpile Size (tons) | Unknown | |
Reclaimed Asphalt Pavement Mix Number | Not set | HMA Pay | No |
Test Details
DIME Sample ID: 2018-02-20-17
DIME Test ID: 2018-02-20-17-4
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: AASHTO T30-15: Standard Method of Test for Mechanical Analysis of Extracted Aggregate (Mechanical Analysis)
Test Release Date: 2018-04-06
Test Results
Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 03/30/2018
Cumulative percent passing the 2 in. sieve: no data
Cumulative percent passing the 1 1/2 in. sieve: 100 %
Cumulative percent passing the 1 in. sieve: 100 %
Cumulative percent passing the 3/4 in. sieve: 100 %
Cumulative percent passing the 1/2 in. sieve: 100 %
Cumulative percent passing the 3/8 in. sieve: 97.8 %
Cumulative percent passing the 1/4 in. sieve: 97.8 %
Cumulative percent passing the #4 sieve: 70.6 %
Cumulative percent passing the #8 sieve: 43.2 %
Cumulative percent passing the #16 sieve: 27.7 %
Cumulative percent passing the #30 sieve: 18.9 %
Cumulative percent passing the #50 sieve: 13.1 %
Cumulative percent passing the #100 sieve: 8.9 %
Cumulative percent passing the #200 sieve: 6 %
General comments (publicly viewable) (Max 1000 characters): Rap 1
Test was verified on 3/30/2018 ✔