Summary for Test 2018-02-20-19-1
Test performed: AASHTO T164-14Project Information
| Project Identifiers | Project ID: 212852 DEA: 010H7604 |
|---|---|
| DIST-CO-RTE-PM | 01-MEN-101-33.0/42.0 |
| Award Date | 10/10/2017 |
| Closeout Date | 08/06/2020 |
| Work Description | Fire Damage Repairs: Roadway Repair, Drainage/Slope Repair, Erosion Control, Fencing, MBGR and Sign Replacement, Hazard Tree and Debris Removal. |
| Location Description | Not set |
| QA Service Level | 1 (Verified on 01/26/2018) |
Sample Information
| Sample Taken Date | 02/20/2018 | Sample Unique Key | 19 |
|---|---|---|---|
| Date that the sample was received by the laboratory/organization performing the testing | 02/22/2018 | Sample type | Quality Control |
| A brief description of the sample | RAP - Chem 3 | The quantity of what the sample constitutes | renewal |
| From where was the sample collected | Manufacturer | First name of sampler or witnessed by | a |
| Last name of sampler or witnessed by | e | Title of sampler | Unknown |
| Telephone number of sampler | Unknown | Laboratory sample identification | 61894 |
| Linked DIME Sample ID | Unknown | The fabricator/manufacturer/facility name | Granite Ukiah |
| Transportation Laboratory (TL) Number | Unknown | Inspector Lot Number from the Transportation Laboratory (TL) Form | Unknown |
| Structure unique identifier | Not set | Structure name | Not set |
| Bid Item | Not set |
Material Information
| Material Type | Reclaimed Asphalt Pavement | RAP Source | granite ukiah |
|---|---|---|---|
| Aggregate Size | Unknown | Aggregate Source | Unknown |
| RAP Stockpile | Stockpile Size (tons) | Unknown | |
| Reclaimed Asphalt Pavement Mix Number | Not set | HMA Pay | No |
Test Details
DIME Sample ID: 2018-02-20-19
DIME Test ID: 2018-02-20-19-1
Testing Lab: CT D01 - District 1 Materials Laboratory
Test Method: AASHTO T164-14: Standard Method of Test for Quantitative Extraction of Asphalt Binder from Hot Mix Asphalt (HMA) (Asphalt Binder Content)
Test Release Date: 2018-04-06
Test Results
Input Type: Calculated
Tester's full name: Leif Ayres
Date of test: 03/30/2018
Corrected Asphalt Binder Content: 5.20 %
General comments (publicly viewable) (Max 1000 characters):
Test was verified on 3/30/2018 ✔
