Summary for Test 2026-05-22-32-2

Test performed: CTM 504-June 2010

Project Information

Project IdentifiersProject ID: 1000403
DEA: 120K91U4
EFIS: 1222000031
DIST-CO-RTE-PM12-ORA-91-R9.2/R11.4
Award Date01/03/2025
Closeout DateNot set
Work DescriptionCONST BRIDGES, RW, SW, PAVEMENT, DRAINAGE AND ELECTRICAL SYSTEMS.
Location DescriptionORANGE COUNTY IN ANAHEIM FROM 0.9 MILE WEST TO 1.3 MILES EAST OF LAKEVIEW AVENUE OVERCROSSING
QA Service Level1 (Verified on 08/19/2024)

Sample Information

Sample Taken Date05/22/2026 Sample Unique Key32
Will the laboratory/organization for which you are a member perform testing on this material sample?Yes Date that the sample was received by the laboratory/organization performing the testing05/23/2026
Sample typeQuality Control A brief description of the sample4x8 cylinders
The quantity of what the sample constitutes15 From where was the sample collectedJob Site
First name of sampler or witnessed byWilliam Last name of sampler or witnessed bySpigner
Title of samplerQC Field Technician Telephone number of sampler
Laboratory sample identificationMix OR572SRP3F Set 5 Linked DIME Sample ID
The fabricator/manufacturer/facility nameAssociated Ready Mix Transportation Laboratory (TL) Number
Inspector Lot Number from the Transportation Laboratory (TL) Form Structure unique identifier00-0000
Structure nameBent 2 Bid ItemNot set

Material Information

Material TypeConcrete The concrete mix design numberOR572SRP3F
The truck number from where the sample was collectedLoad 47 The batch plant ticket number from where the sample was collected0
Concrete batch plant The fabricator/manufacturer designation for the sampleSet 5
A detailed description of where the material sample was collectedBent 2 Where the material sample would have been placed if not sampled
From Lot No. Bag Lot No.

Test Details

DIME Sample ID: 2026-05-22-32
DIME Test ID: 2026-05-22-32-2
Testing Lab: G3 Quality, Incorporated - Cerritos
Test Method: CTM 504-June 2010: Method of Test for Determining Air Content of Freshly Mixed Concrete by the Pressure Method
Test Release Date: 2026-07-06

Test Results


Input Type: Calculated
Tester's full name: William Spigner
Date of test: 05/22/2026
Air Content: 1.6 %
General comments (publicly viewable) (Max 1000 characters):

Test was verified on 7/6/2026